Port Talbot Parkway
PTAWalesManaged by TfW Rail
How this station is performing
Port Talbot Parkway had 33,106 scheduled stops to Period 7 of 2026-27, about 91 a day. 63.8% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Port Talbot Parkway opened on 19 June 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Port Talbot Parkway is the oldest; the next oldest, Neath, dates from 1850.
The nearest stations to Port Talbot Parkway are Baglan (3.1 km north-west), Briton Ferry (5.7 km north-west), Neath (8.0 km north), Skewen (8.9 km north-west) and Maesteg (9.0 km east). 8 stations lie within 10 km in all. Of the five, Maesteg is the most punctual at 76.5% and Baglan the least at 58.3%, with Port Talbot Parkway on 63.8%.
Port Talbot Parkway is a parkway station, 1.3 km from the centre of Port Talbot, a town, home to about 37,276 people, which gives it its name.
2 operators call at Port Talbot Parkway: Transport for Wales (64.9%, 55% of stops) and Great Western Railway (62.4%, 45% of stops). They are close together, with Transport for Wales leading on 64.9% and Great Western Railway trailing on 62.4%, a gap of 2.5 percentage points.
2 of 3 stations of a similar size in Wales are more punctual than Port Talbot Parkway on 63.8%. The comparison group includes Neath (63.2%), Wrexham General (81.3%) and Barry Island (96.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 18,303 | 64.9% | 2.7% |
| Great Western Railway | 14,803 | 62.4% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Port Talbot Parkway? Delay Repay
These operators call at Port Talbot Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,549 | 63.2% | 2.6% |
| Period 6 of 2026-27 | 2,562 | 61.3% | 2.3% |
| Period 5 of 2026-27 | 2,506 | 54.8% | 4.3% |
| Period 4 of 2026-27 | 2,467 | 59.9% | 3.8% |
| Period 3 of 2026-27 | 2,537 | 65.6% | 2.5% |
| Period 2 of 2026-27 | 2,544 | 66.2% | 2.0% |
| Period 1 of 2026-27 | 2,974 | 69.0% | 2.3% |
| Period 13 of 2025-26 | 2,817 | 71.1% | 1.0% |
| Period 12 of 2025-26 | 2,400 | 72.7% | 1.4% |
| Period 11 of 2025-26 | 2,318 | 73.8% | 1.7% |
| Period 10 of 2025-26 | 2,250 | 60.0% | 2.9% |
| Period 9 of 2025-26 | 2,601 | 50.1% | 3.6% |
| Period 8 of 2025-26 | 2,581 | 60.4% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Neath | 31,785 | 63.2% | 2.6% |
| Wrexham General | 34,580 | 81.3% | 4.1% |
| Barry Island | 31,406 | 96.4% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out