Transport for Wales at Port Talbot Parkway
All trains at Port Talbot ParkwayTransport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 18,303 scheduled stops at Port Talbot Parkway in the 13 periods to Period 7 of 2026-27, 55% of the station's total. 64.9% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
Transport for Wales trains at Port Talbot Parkway also serve Baglan (3.1 km north-west, 58.3% on time, 2.7% cancelled), Briton Ferry (5.7 km north-west, 58.6% on time, 2.8% cancelled), Neath (8.0 km north, 63.1% on time, 2.8% cancelled), Skewen (8.9 km north-west, 58.3% on time, 2.7% cancelled), Maesteg (9.0 km east, 76.5% on time, 2.8% cancelled) and Maesteg (Ewenny Road) (9.3 km east, 73.3% on time, 3.0% cancelled), which are the stations on its network closest to Port Talbot Parkway.
Within 30 km of here, Transport for Wales runs best at Treherbert, 19.1 km north-east (98.1%), and worst at Baglan, 3.1 km north-west (58.3%).
The busiest Transport for Wales station within 30 km of Port Talbot Parkway is Bridgend, 17.1 km south-east, with about 116 scheduled stops a day.
Of the 2 operators with enough records at Port Talbot Parkway, Transport for Wales is the most punctual, at 64.9%.
For Transport for Wales, Port Talbot Parkway is the 216th best of 228 ranked stations. Its 64.9% here is 20.1 percentage points below the 85.0% across the whole network.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,397 | 63.3% | 2.6% |
| Period 6 of 2026-27 | 1,399 | 63.2% | 2.2% |
| Period 5 of 2026-27 | 1,400 | 58.0% | 4.5% |
| Period 4 of 2026-27 | 1,433 | 60.7% | 5.6% |
| Period 3 of 2026-27 | 1,415 | 66.3% | 2.6% |
| Period 2 of 2026-27 | 1,416 | 66.7% | 2.3% |
| Period 1 of 2026-27 | 1,631 | 69.9% | 2.5% |
| Period 13 of 2025-26 | 1,563 | 73.3% | 1.2% |
| Period 12 of 2025-26 | 1,322 | 73.6% | 1.7% |
| Period 11 of 2025-26 | 1,251 | 76.2% | 2.1% |
| Period 10 of 2025-26 | 1,245 | 62.2% | 2.0% |
| Period 9 of 2025-26 | 1,421 | 49.9% | 3.2% |
| Period 8 of 2025-26 | 1,410 | 60.0% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Port Talbot Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,803 | 62.4% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out