How this operator is doing here
Great Western Railway had 14,803 scheduled stops at Port Talbot Parkway in the 13 periods to Period 7 of 2026-27, 45% of the station's total. 62.4% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Great Western Railway trains at Port Talbot Parkway also serve Neath (8.0 km north, 63.3% on time, 2.3% cancelled), Swansea (11.6 km west, 64.0% on time, 2.5% cancelled), Bridgend (17.1 km south-east, 61.2% on time, 2.2% cancelled), Llanelli (27.7 km west, 76.0% on time, 6.0% cancelled), Pembrey and Burry Port (33.8 km west, 76.6% on time, 6.0% cancelled) and Kidwelly (40.2 km north-west, – on time, – cancelled), which are the stations on its network closest to Port Talbot Parkway.
Within 30 km of here, Great Western Railway runs best at Llanelli, 27.7 km west (76.0%), and worst at Bridgend, 17.1 km south-east (61.2%).
The busiest Great Western Railway station within 30 km of Port Talbot Parkway is Bridgend, 17.1 km south-east, with about 41 scheduled stops a day.
Of the 2 operators with enough records at Port Talbot Parkway, Great Western Railway is the least punctual, at 62.4%.
For Great Western Railway, Port Talbot Parkway is the 190th best of 210 ranked stations. Its 62.4% here is 13.3 percentage points below the 75.7% across the whole network.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,152 | 63.0% | 2.5% |
| Period 6 of 2026-27 | 1,163 | 58.9% | 2.4% |
| Period 5 of 2026-27 | 1,106 | 50.7% | 4.1% |
| Period 4 of 2026-27 | 1,034 | 58.8% | 1.4% |
| Period 3 of 2026-27 | 1,122 | 64.6% | 2.3% |
| Period 2 of 2026-27 | 1,128 | 65.6% | 1.7% |
| Period 1 of 2026-27 | 1,343 | 67.9% | 2.0% |
| Period 13 of 2025-26 | 1,254 | 68.4% | 0.7% |
| Period 12 of 2025-26 | 1,078 | 71.7% | 1.1% |
| Period 11 of 2025-26 | 1,067 | 71.2% | 1.2% |
| Period 10 of 2025-26 | 1,005 | 57.3% | 4.1% |
| Period 9 of 2025-26 | 1,180 | 50.4% | 4.1% |
| Period 8 of 2025-26 | 1,171 | 60.8% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Port Talbot Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 18,303 | 64.9% | 2.7% |