Poole
POOSouth WestManaged by South Western Railway
How this station is performing
Poole had 35,377 scheduled stops to Period 7 of 2026-27, about 97 a day. 71.3% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
Poole opened on 2 December 1872, 154 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hamworthy is the oldest (1847) and Holton Heath the newest (1916), with Poole in between.
The nearest stations to Poole are Parkstone (Dorset) (2.6 km east), Hamworthy (2.6 km west), Branksome (4.6 km east), Holton Heath (6.7 km west) and Bournemouth (8.5 km east). 6 stations lie within 10 km in all. Of the five, Branksome is the most punctual at 74.5% and Bournemouth the least at 69.7%, with Poole on 71.3%.
Poole is one of 2 stations named after a town called Poole, home to about 144,800 people; this one stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Poole was Period 9 of 2024-25, at 54.8%, some time before the latest year. The strongest was Period 1 of 2025-26, at 84.5%, and the two are 29.7 percentage points apart. Cancellations peaked at 10.1% of scheduled stops in Period 9 of 2024-25, against 5.0% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Poole is the least punctual, at 71.3%. All of them are ahead, including Lawrence Hill (82.8%), Stapleton Road (79.2%) and Dawlish (76.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 35,377 | 71.3% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Poole? Delay Repay
These operators call at Poole and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,657 | 68.6% | 4.4% |
| Period 6 of 2026-27 | 2,737 | 77.8% | 1.5% |
| Period 5 of 2026-27 | 2,753 | 67.3% | 5.4% |
| Period 4 of 2026-27 | 2,722 | 60.1% | 7.0% |
| Period 3 of 2026-27 | 2,539 | 69.6% | 6.6% |
| Period 2 of 2026-27 | 2,754 | 66.9% | 7.2% |
| Period 1 of 2026-27 | 3,157 | 81.5% | 3.1% |
| Period 13 of 2025-26 | 3,050 | 77.5% | 4.2% |
| Period 12 of 2025-26 | 2,702 | 77.0% | 5.9% |
| Period 11 of 2025-26 | 2,752 | 76.1% | 6.4% |
| Period 10 of 2025-26 | 2,433 | 74.1% | 4.4% |
| Period 9 of 2025-26 | 2,544 | 64.2% | 4.4% |
| Period 8 of 2025-26 | 2,577 | 62.7% | 5.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lawrence Hill | 34,630 | 82.8% | 4.6% |
| Stapleton Road | 34,630 | 79.2% | 4.6% |
| Dawlish | 34,383 | 76.5% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out