Pontefract Monkhill
PFMYorkshire and The HumberManaged by Northern Trains
How this station is performing
Pontefract Monkhill had 25,514 scheduled stops to Period 7 of 2026-27, about 70 a day. 77.2% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Pontefract Monkhill opened on 1 April 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pontefract Monkhill is the oldest; the next oldest, Knottingley, dates from 1848.
The nearest stations to Pontefract Monkhill are Pontefract Baghill (0.8 km south), Pontefract Tanshelf (1.1 km south-west), Glasshoughton (2.7 km north-west), Knottingley (3.1 km east) and Featherstone (4.1 km south-west). 11 stations lie within 10 km in all. Of the five, Knottingley is the most punctual at 85.0% and Pontefract Baghill the least at 64.7%, with Pontefract Monkhill on 77.2%.
Pontefract Monkhill is named after Pontefract, a market town, home to about 30,881 people, but the station stands 1.0 km from its centre.
2 operators call at Pontefract Monkhill: Northern (79.0%, 92% of stops) and Grand Central (56.2%, 8% of stops). The operator you travel with matters: Northern reaches 79.0% within three minutes while Grand Central manages 56.2%, a gap of 22.8 percentage points.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Pontefract Monkhill on 77.2%. The comparison group includes Goole (75.8%), Chapeltown (South Yorkshire) (82.9%) and Elsecar (79.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,541 | 79.0% | 3.8% |
| Grand Central | 1,973 | 56.2% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Pontefract Monkhill? Delay Repay
These operators call at Pontefract Monkhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,945 | 77.9% | 3.8% |
| Period 6 of 2026-27 | 1,949 | 80.4% | 2.5% |
| Period 5 of 2026-27 | 1,953 | 77.6% | 3.4% |
| Period 4 of 2026-27 | 1,914 | 77.5% | 7.3% |
| Period 3 of 2026-27 | 1,953 | 76.8% | 5.3% |
| Period 2 of 2026-27 | 1,944 | 79.1% | 5.0% |
| Period 1 of 2026-27 | 2,252 | 80.2% | 3.0% |
| Period 13 of 2025-26 | 2,126 | 84.8% | 2.3% |
| Period 12 of 2025-26 | 1,924 | 78.0% | 3.1% |
| Period 11 of 2025-26 | 1,942 | 74.0% | 4.2% |
| Period 10 of 2025-26 | 1,754 | 73.7% | 3.1% |
| Period 9 of 2025-26 | 1,931 | 67.8% | 3.9% |
| Period 8 of 2025-26 | 1,927 | 73.8% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Goole | 25,536 | 75.8% | 3.0% |
| Chapeltown (South Yorkshire) | 25,566 | 82.9% | 1.8% |
| Elsecar | 25,566 | 79.4% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out