Chapeltown (South Yorkshire)
CLNYorkshire and The HumberManaged by Northern Trains
How this station is performing
Chapeltown (South Yorkshire) had 25,566 scheduled stops to Period 7 of 2026-27, about 70 a day. 82.9% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Chapeltown (South Yorkshire) opened on 1 July 1897. It was moved to the site it uses now on 2 August 1982. Among the 5 stations nearest to it with a known opening date, Sheffield is the oldest (1838) and Meadowhall the newest (1990), with Chapeltown (South Yorkshire) in between.
The nearest stations to Chapeltown (South Yorkshire) are Elsecar (4.8 km north-east), Meadowhall (6.1 km south-east), Wombwell (7.0 km north-east), Rotherham Central (7.8 km south-east) and Sheffield (9.4 km south). 6 stations lie within 10 km in all. At 82.9%, Chapeltown (South Yorkshire) is more punctual than every one of them; the best of the five, Wombwell, manages 79.7%.
Chapeltown (South Yorkshire) is named after Chapeltown, a suburb, home to about 10,043 people, but the station stands 0.1 km from its centre.
The time of year matters a great deal for Chapeltown (South Yorkshire). Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 73.9%, while period 13 (March) is the strongest at 86.3%, a spread of 12.4 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Chapeltown (South Yorkshire) is the most punctual, at 82.9%. The comparison group includes Elsecar (79.4%), Wombwell (79.7%) and Goole (75.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 25,566 | 82.9% | 1.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,921 | 85.5% | 1.7% |
| Period 6 of 2026-27 | 1,956 | 85.4% | 1.0% |
| Period 5 of 2026-27 | 1,956 | 83.4% | 2.1% |
| Period 4 of 2026-27 | 1,955 | 84.7% | 2.5% |
| Period 3 of 2026-27 | 1,956 | 82.1% | 1.6% |
| Period 2 of 2026-27 | 1,951 | 80.6% | 2.2% |
| Period 1 of 2026-27 | 2,256 | 85.5% | 1.5% |
| Period 13 of 2025-26 | 2,135 | 87.3% | 0.8% |
| Period 12 of 2025-26 | 1,899 | 81.9% | 1.8% |
| Period 11 of 2025-26 | 1,949 | 83.7% | 2.1% |
| Period 10 of 2025-26 | 1,752 | 82.5% | 2.4% |
| Period 9 of 2025-26 | 1,940 | 74.1% | 2.5% |
| Period 8 of 2025-26 | 1,940 | 79.7% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out