Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Grand Central at Pontefract Monkhill

All trains at Pontefract MonkhillGrand Central across BritainYorkshire and The Humber

On time, last 13 periods56.2%Whole station: 77.2%
Cancelled2.9%Whole station: 3.8%
Scheduled stops1,973Of 25,514 at the station

How this operator is doing here

Grand Central had 1,973 scheduled stops at Pontefract Monkhill in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 56.2% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.

Grand Central trains at Pontefract Monkhill also serve Wakefield Kirkgate (12.3 km west, 60.3% on time, 2.0% cancelled), Wakefield Westgate (13.4 km west, – on time, – cancelled), Doncaster (22.5 km south-east, 51.5% on time, 2.2% cancelled), Mirfield (25.7 km west, 59.1% on time, 2.3% cancelled), Low Moor (30.0 km west, 65.0% on time, 2.6% cancelled) and Bradford Interchange (31.0 km west, 68.1% on time, 2.2% cancelled), which are the stations on its network closest to Pontefract Monkhill.

The busiest Grand Central station within 30 km of Pontefract Monkhill is Doncaster, 22.5 km south-east, with about 8 scheduled stops a day.

Of the 2 operators with enough records at Pontefract Monkhill, Grand Central is the least punctual, at 56.2%.

Grand Central at Pontefract Monkhill has slipped sharply. 56.2% of stops came within three minutes of the timetable in the latest 13 periods, 13.1 percentage points worse than the 69.3% recorded in the 13 before. Cancellations held steady at 2.9% of scheduled stops, against 3.0% before.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 81.8%Period 2 of 2023-24: 72.8%Period 3 of 2023-24: 73.3%Period 4 of 2023-24: 72.2%Period 5 of 2023-24: 57.9%Period 6 of 2023-24: 48.0%Period 7 of 2023-24: 47.4%Period 8 of 2023-24: 53.4%Period 9 of 2023-24: 49.6%Period 10 of 2023-24: 44.2%Period 11 of 2023-24: 59.8%Period 12 of 2023-24: 69.8%Period 2 of 2024-25: 78.4%Period 3 of 2024-25: 73.3%Period 4 of 2024-25: 68.1%Period 5 of 2024-25: 66.1%Period 6 of 2024-25: 58.5%Period 7 of 2024-25: 61.7%Period 8 of 2024-25: 65.3%Period 9 of 2024-25: 64.8%Period 10 of 2024-25: 73.3%Period 11 of 2024-25: 57.6%Period 12 of 2024-25: 67.7%Period 13 of 2024-25: 75.9%Period 1 of 2025-26: 72.5%Period 2 of 2025-26: 68.2%Period 3 of 2025-26: 77.6%Period 4 of 2025-26: 73.0%Period 5 of 2025-26: 66.7%Period 6 of 2025-26: 68.6%Period 7 of 2025-26: 70.5%Period 8 of 2025-26: 75.2%Period 9 of 2025-26: 65.4%Period 10 of 2025-26: 56.5%Period 11 of 2025-26: 54.7%Period 12 of 2025-26: 67.7%Period 13 of 2025-26: 71.4%Period 1 of 2026-27: 58.1%Period 2 of 2026-27: 48.3%Period 3 of 2026-27: 45.8%Period 4 of 2026-27: 43.2%Period 5 of 2026-27: 49.7%Period 6 of 2026-27: 48.3%Period 7 of 2026-27: 49.7%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 11.8%Period 2 of 2023-24: 5.4%Period 3 of 2023-24: 3.2%Period 4 of 2023-24: 3.2%Period 5 of 2023-24: 4.0%Period 6 of 2023-24: 6.2%Period 7 of 2023-24: 3.3%Period 8 of 2023-24: 1.7%Period 9 of 2023-24: 3.8%Period 10 of 2023-24: 2.0%Period 11 of 2023-24: 5.1%Period 12 of 2023-24: 4.0%Period 2 of 2024-25: 3.3%Period 3 of 2024-25: 0.8%Period 4 of 2024-25: 0.0%Period 5 of 2024-25: 5.2%Period 6 of 2024-25: 7.0%Period 7 of 2024-25: 1.7%Period 8 of 2024-25: 3.3%Period 9 of 2024-25: 2.1%Period 10 of 2024-25: 3.8%Period 11 of 2024-25: 3.1%Period 12 of 2024-25: 0.0%Period 13 of 2024-25: 6.3%Period 1 of 2025-26: 5.5%Period 2 of 2025-26: 2.2%Period 3 of 2025-26: 4.6%Period 4 of 2025-26: 2.1%Period 5 of 2025-26: 3.8%Period 6 of 2025-26: 1.4%Period 7 of 2025-26: 0.7%Period 8 of 2025-26: 2.1%Period 9 of 2025-26: 3.7%Period 10 of 2025-26: 1.5%Period 11 of 2025-26: 3.9%Period 12 of 2025-26: 3.8%Period 13 of 2025-26: 1.8%Period 1 of 2026-27: 1.6%Period 2 of 2026-27: 2.7%Period 3 of 2026-27: 1.3%Period 4 of 2026-27: 3.1%Period 5 of 2026-27: 2.5%Period 6 of 2026-27: 2.6%Period 7 of 2026-27: 7.6%2023-242024-252025-262026-27

See how Grand Central Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2715749.7%7.6%
Period 6 of 2026-2715348.3%2.6%
Period 5 of 2026-2715749.7%2.5%
Period 4 of 2026-2716043.2%3.1%
Period 3 of 2026-2715745.8%1.3%
Period 2 of 2026-2714948.3%2.7%
Period 1 of 2026-2718258.1%1.6%
Period 13 of 2025-2616471.4%1.8%
Period 12 of 2025-2613267.7%3.8%
Period 11 of 2025-2615454.7%3.9%
Period 10 of 2025-2613356.5%1.5%
Period 9 of 2025-2613565.4%3.7%
Period 8 of 2025-2614075.2%2.1%

Time of year

50%60%70%80%90%P1: 68.0%1P2: 65.4%2P3: 65.6%3P4: 62.5%4P5: 59.4%5P6: 56.1%6P7: 57.5%7P8: 65.2%8P9: 60.2%9P10: 58.1%10P11: 57.1%11P12: 68.3%12P13: 73.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Pontefract Monkhill

OperatorScheduled stopsWithin 3 minCancelled
Northern23,54179.0%3.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out