Grand Central at Pontefract Monkhill
All trains at Pontefract MonkhillGrand Central across BritainYorkshire and The Humber
How this operator is doing here
Grand Central had 1,973 scheduled stops at Pontefract Monkhill in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 56.2% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
Grand Central trains at Pontefract Monkhill also serve Wakefield Kirkgate (12.3 km west, 60.3% on time, 2.0% cancelled), Wakefield Westgate (13.4 km west, – on time, – cancelled), Doncaster (22.5 km south-east, 51.5% on time, 2.2% cancelled), Mirfield (25.7 km west, 59.1% on time, 2.3% cancelled), Low Moor (30.0 km west, 65.0% on time, 2.6% cancelled) and Bradford Interchange (31.0 km west, 68.1% on time, 2.2% cancelled), which are the stations on its network closest to Pontefract Monkhill.
The busiest Grand Central station within 30 km of Pontefract Monkhill is Doncaster, 22.5 km south-east, with about 8 scheduled stops a day.
Of the 2 operators with enough records at Pontefract Monkhill, Grand Central is the least punctual, at 56.2%.
Grand Central at Pontefract Monkhill has slipped sharply. 56.2% of stops came within three minutes of the timetable in the latest 13 periods, 13.1 percentage points worse than the 69.3% recorded in the 13 before. Cancellations held steady at 2.9% of scheduled stops, against 3.0% before.
Period by period
See how Grand Central Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 157 | 49.7% | 7.6% |
| Period 6 of 2026-27 | 153 | 48.3% | 2.6% |
| Period 5 of 2026-27 | 157 | 49.7% | 2.5% |
| Period 4 of 2026-27 | 160 | 43.2% | 3.1% |
| Period 3 of 2026-27 | 157 | 45.8% | 1.3% |
| Period 2 of 2026-27 | 149 | 48.3% | 2.7% |
| Period 1 of 2026-27 | 182 | 58.1% | 1.6% |
| Period 13 of 2025-26 | 164 | 71.4% | 1.8% |
| Period 12 of 2025-26 | 132 | 67.7% | 3.8% |
| Period 11 of 2025-26 | 154 | 54.7% | 3.9% |
| Period 10 of 2025-26 | 133 | 56.5% | 1.5% |
| Period 9 of 2025-26 | 135 | 65.4% | 3.7% |
| Period 8 of 2025-26 | 140 | 75.2% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Pontefract Monkhill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,541 | 79.0% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out