Elsecar
ELRYorkshire and The HumberManaged by Northern Trains
How this station is performing
Elsecar had 25,566 scheduled stops to Period 7 of 2026-27, about 70 a day. 79.4% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Elsecar opened on 1 July 1897, 129 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Elsecar is the newest; the oldest, Swinton (South Yorks), opened in 1840.
The nearest stations to Elsecar are Wombwell (2.2 km north), Chapeltown (South Yorkshire) (4.8 km south-west), Barnsley (7.0 km north-west), Bolton-upon-Dearne (8.0 km east) and Swinton (South Yorks) (8.2 km east). 12 stations lie within 10 km in all. Of the five, Chapeltown (South Yorkshire) is the most punctual at 82.9% and Bolton-upon-Dearne the least at 71.8%, with Elsecar on 79.4%.
Elsecar takes its name from a Village called Elsecar, home to about 2,500 people, and the station stands 1.1 km from its centre.
Across the whole run of data, the weakest four-week period for Elsecar was Period 9 of 2023-24, at 65.0%, some time before the latest year. The strongest was Period 2 of 2024-25, at 85.0%, and the two are 20.0 percentage points apart. Cancellations peaked at 13.0% of scheduled stops in Period 10 of 2024-25, against 1.8% over the latest 13 periods.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Elsecar on 79.4%. The comparison group includes Chapeltown (South Yorkshire) (82.9%), Wombwell (79.7%) and Goole (75.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 25,566 | 79.4% | 1.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,921 | 82.8% | 1.7% |
| Period 6 of 2026-27 | 1,956 | 82.2% | 1.0% |
| Period 5 of 2026-27 | 1,956 | 80.7% | 2.1% |
| Period 4 of 2026-27 | 1,955 | 81.0% | 2.5% |
| Period 3 of 2026-27 | 1,956 | 77.9% | 1.6% |
| Period 2 of 2026-27 | 1,951 | 76.8% | 2.2% |
| Period 1 of 2026-27 | 2,256 | 82.2% | 1.6% |
| Period 13 of 2025-26 | 2,135 | 84.8% | 0.8% |
| Period 12 of 2025-26 | 1,899 | 78.2% | 1.9% |
| Period 11 of 2025-26 | 1,949 | 80.5% | 2.1% |
| Period 10 of 2025-26 | 1,752 | 79.0% | 2.5% |
| Period 9 of 2025-26 | 1,940 | 69.6% | 2.5% |
| Period 8 of 2025-26 | 1,940 | 75.5% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chapeltown (South Yorkshire) | 25,566 | 82.9% | 1.8% |
| Wombwell | 25,566 | 79.7% | 1.8% |
| Goole | 25,536 | 75.8% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out