Pollokshaws East
PWEScotlandManaged by ScotRail
How this station is performing
Pollokshaws East had 23,071 scheduled stops to Period 7 of 2026-27, about 63 a day. 93.9% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Pollokshaws East opened on 2 April 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pollokshaws East is the newest; the oldest, Pollokshaws West, opened in 1848.
The nearest stations to Pollokshaws East are Shawlands (0.6 km north-west), Langside (0.8 km south-east), Pollokshaws West (0.9 km west), Crossmyloof (1.0 km north) and Maxwell Park (1.5 km north). 78 stations lie within 10 km in all. Of the five, Crossmyloof is the most punctual at 95.8% and Langside the least at 93.1%, with Pollokshaws East on 93.9%.
In Scotland, Pollokshaws East ranks 49th of 313 ranked stations. Its 93.9% is 6.2 percentage points better than the area median of 87.7%.
For Pollokshaws East, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 89.5% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 98.0%, which is 8.5 percentage points higher.
2 of 3 stations of a similar size in Scotland are more punctual than Pollokshaws East on 93.9%. The comparison group includes Langside (93.1%), Maxwell Park (94.8%) and Pollokshields West (94.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,071 | 93.9% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Pollokshaws East? Delay Repay
These operators call at Pollokshaws East and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,872 | 94.7% | 0.4% |
| Period 6 of 2026-27 | 1,842 | 96.6% | 0.8% |
| Period 5 of 2026-27 | 1,608 | 95.4% | 0.7% |
| Period 4 of 2026-27 | 1,872 | 93.1% | 1.4% |
| Period 3 of 2026-27 | 1,872 | 91.8% | 4.2% |
| Period 2 of 2026-27 | 1,764 | 93.4% | 1.6% |
| Period 1 of 2026-27 | 2,162 | 93.9% | 1.4% |
| Period 13 of 2025-26 | 966 | 96.0% | 1.7% |
| Period 12 of 2025-26 | 1,872 | 96.5% | 0.4% |
| Period 11 of 2025-26 | 1,872 | 94.8% | 0.8% |
| Period 10 of 2025-26 | 1,622 | 93.5% | 0.9% |
| Period 9 of 2025-26 | 1,875 | 89.5% | 4.3% |
| Period 8 of 2025-26 | 1,872 | 93.0% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Langside | 23,071 | 93.1% | 1.5% |
| Maxwell Park | 23,071 | 94.8% | 1.5% |
| Pollokshields West | 23,071 | 94.2% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out