Maxwell Park
MAXScotlandManaged by ScotRail
How this station is performing
Maxwell Park had 23,071 scheduled stops to Period 7 of 2026-27, about 63 a day. 94.8% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Maxwell Park opened on 2 April 1894, 132 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Pollokshields East is the oldest (1886) and Dumbreck the newest (1990), with Maxwell Park in between.
The nearest stations to Maxwell Park are Crossmyloof (0.5 km south-east), Pollokshields West (0.8 km east), Shawlands (1.0 km south), Dumbreck (1.1 km north-west) and Pollokshields East (1.3 km east). 81 stations lie within 10 km in all. Of the five, Dumbreck is the most punctual at 95.9% and Pollokshields West the least at 94.2%, with Maxwell Park on 94.8%.
In Scotland, Maxwell Park ranks 36th of 313 ranked stations. Its 94.8% is 7.1 percentage points better than the area median of 87.7%.
ScotRail is the only operator serving Maxwell Park. Here it manages 94.8% within three minutes, 6.9 percentage points better than its 87.9% across its whole network.
Compared with 3 stations of a similar size in Scotland, Maxwell Park is the most punctual, at 94.8%. The comparison group includes Langside (93.1%), Pollokshaws East (93.9%) and Pollokshields West (94.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,071 | 94.8% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Maxwell Park? Delay Repay
These operators call at Maxwell Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,872 | 95.1% | 0.4% |
| Period 6 of 2026-27 | 1,842 | 97.3% | 0.8% |
| Period 5 of 2026-27 | 1,608 | 96.6% | 0.7% |
| Period 4 of 2026-27 | 1,872 | 94.6% | 1.4% |
| Period 3 of 2026-27 | 1,872 | 92.9% | 4.2% |
| Period 2 of 2026-27 | 1,764 | 94.9% | 1.6% |
| Period 1 of 2026-27 | 2,162 | 94.4% | 1.4% |
| Period 13 of 2025-26 | 966 | 96.2% | 1.7% |
| Period 12 of 2025-26 | 1,872 | 96.8% | 0.4% |
| Period 11 of 2025-26 | 1,872 | 95.0% | 0.8% |
| Period 10 of 2025-26 | 1,622 | 94.9% | 0.9% |
| Period 9 of 2025-26 | 1,875 | 91.4% | 4.3% |
| Period 8 of 2025-26 | 1,872 | 93.3% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Langside | 23,071 | 93.1% | 1.5% |
| Pollokshaws East | 23,071 | 93.9% | 1.5% |
| Pollokshields West | 23,071 | 94.2% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out