Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Langside

LGSScotlandManaged by ScotRail

On time, last 13 periods93.1%Great Britain: 83.6%
Cancelled1.5%Great Britain: 3.2%
Stops a day63Scheduled, on average
Punctuality rank272nd of 2,374Among ranked stations

How this station is performing

Langside had 23,071 scheduled stops to Period 7 of 2026-27, about 63 a day. 93.1% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.

Langside opened on 2 April 1894, 132 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Cathcart is the oldest (1886) and Muirend the newest (1903), with Langside in between.

The nearest stations to Langside are Pollokshaws East (0.8 km north-west), Cathcart (1.1 km east), Mount Florida (1.2 km north-east), Muirend (1.2 km south) and Shawlands (1.4 km north-west). 76 stations lie within 10 km in all. At 93.1%, Langside is less punctual than all of them; the best of the five, Muirend, manages 97.4%.

For Langside, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 87.7% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 97.5%, which is 9.8 percentage points higher.

Compared with 3 stations of a similar size in Scotland, Langside is the least punctual, at 93.1%. All of them are ahead, including Maxwell Park (94.8%), Pollokshaws East (93.9%) and Pollokshields West (94.2%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.5%Period 2 of 2023-24: 97.5%Period 3 of 2023-24: 95.9%Period 4 of 2023-24: 96.7%Period 5 of 2023-24: 96.5%Period 6 of 2023-24: 97.2%Period 7 of 2023-24: 93.0%Period 8 of 2023-24: 89.3%Period 9 of 2023-24: 90.6%Period 10 of 2023-24: 90.3%Period 11 of 2023-24: 93.6%Period 12 of 2023-24: 94.5%Period 13 of 2023-24: 95.9%Period 1 of 2024-25: 95.3%Period 2 of 2024-25: 94.5%Period 3 of 2024-25: 95.7%Period 4 of 2024-25: 95.6%Period 5 of 2024-25: 92.5%Period 6 of 2024-25: 92.1%Period 7 of 2024-25: 93.0%Period 8 of 2024-25: 88.2%Period 9 of 2024-25: 90.5%Period 10 of 2024-25: 93.3%Period 11 of 2024-25: 94.7%Period 12 of 2024-25: 94.3%Period 13 of 2024-25: 95.5%Period 1 of 2025-26: 96.1%Period 2 of 2025-26: 95.3%Period 3 of 2025-26: 94.1%Period 4 of 2025-26: 95.7%Period 5 of 2025-26: 94.7%Period 6 of 2025-26: 92.2%Period 7 of 2025-26: 93.4%Period 8 of 2025-26: 92.0%Period 9 of 2025-26: 87.7%Period 10 of 2025-26: 93.2%Period 11 of 2025-26: 94.1%Period 12 of 2025-26: 95.5%Period 13 of 2025-26: 94.9%Period 1 of 2026-27: 92.9%Period 2 of 2026-27: 92.3%Period 3 of 2026-27: 90.5%Period 4 of 2026-27: 92.5%Period 5 of 2026-27: 94.8%Period 6 of 2026-27: 96.3%Period 7 of 2026-27: 94.3%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.1%Period 2 of 2023-24: 0.5%Period 3 of 2023-24: 0.8%Period 4 of 2023-24: 0.6%Period 5 of 2023-24: 0.7%Period 6 of 2023-24: 0.8%Period 7 of 2023-24: 2.4%Period 8 of 2023-24: 0.6%Period 9 of 2023-24: 0.6%Period 10 of 2023-24: 1.6%Period 11 of 2023-24: 2.7%Period 12 of 2023-24: 0.5%Period 13 of 2023-24: 0.5%Period 1 of 2024-25: 0.5%Period 2 of 2024-25: 0.7%Period 3 of 2024-25: 1.0%Period 4 of 2024-25: 4.3%Period 5 of 2024-25: 1.3%Period 6 of 2024-25: 3.7%Period 7 of 2024-25: 0.8%Period 8 of 2024-25: 1.0%Period 9 of 2024-25: 1.4%Period 10 of 2024-25: 1.9%Period 11 of 2024-25: 2.9%Period 12 of 2024-25: 0.2%Period 13 of 2024-25: 0.7%Period 1 of 2025-26: 0.3%Period 2 of 2025-26: 1.3%Period 3 of 2025-26: 2.4%Period 4 of 2025-26: 0.5%Period 5 of 2025-26: 1.8%Period 6 of 2025-26: 1.3%Period 7 of 2025-26: 1.6%Period 8 of 2025-26: 0.6%Period 9 of 2025-26: 4.3%Period 10 of 2025-26: 0.9%Period 11 of 2025-26: 0.8%Period 12 of 2025-26: 0.3%Period 13 of 2025-26: 1.7%Period 1 of 2026-27: 1.4%Period 2 of 2026-27: 1.6%Period 3 of 2026-27: 4.2%Period 4 of 2026-27: 1.4%Period 5 of 2026-27: 0.7%Period 6 of 2026-27: 0.8%Period 7 of 2026-27: 0.4%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail23,07193.1%1.5%

Operators with their own page for this station are linked to it.

Late train at Langside? Delay Repay

These operators call at Langside and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,87294.3%0.4%
Period 6 of 2026-271,84296.3%0.8%
Period 5 of 2026-271,60894.8%0.7%
Period 4 of 2026-271,87292.5%1.4%
Period 3 of 2026-271,87290.5%4.2%
Period 2 of 2026-271,76492.3%1.6%
Period 1 of 2026-272,16292.9%1.4%
Period 13 of 2025-2696694.9%1.7%
Period 12 of 2025-261,87295.5%0.3%
Period 11 of 2025-261,87294.1%0.8%
Period 10 of 2025-261,62293.2%0.9%
Period 9 of 2025-261,87587.7%4.3%
Period 8 of 2025-261,87292.0%0.6%

Time of year

80%90%100%P1: 95.0%1P2: 94.7%2P3: 93.9%3P4: 94.9%4P5: 94.7%5P6: 94.5%6P7: 93.5%7P8: 89.9%8P9: 89.5%9P10: 92.3%10P11: 94.1%11P12: 94.8%12P13: 95.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Maxwell Park23,07194.8%1.5%
Pollokshaws East23,07193.9%1.5%
Pollokshields West23,07194.2%1.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out