GTR at Plumstead
How this operator is doing here
GTR had 23,094 scheduled stops at Plumstead in the 13 periods to Period 7 of 2026-27, 29% of the station's total. 85.5% of recorded arrivals came within three minutes and 6.3% of stops were cancelled.
GTR trains at Plumstead also serve Woolwich Arsenal (1.0 km west, 82.9% on time, 6.5% cancelled), Abbey Wood (2.5 km east, 86.0% on time, 6.4% cancelled), Charlton (3.7 km west, 84.1% on time, 6.5% cancelled), Eltham (4.4 km south-west, 90.0% on time, 1.3% cancelled), Bexleyheath (4.5 km south-east, 90.0% on time, 1.3% cancelled) and Westcombe Park (4.6 km west, 82.7% on time, 6.7% cancelled), which are the stations on its network closest to Plumstead.
Within 30 km of here, GTR runs best at Beckenham Junction, 11.6 km south-west (98.1%), and worst at Kenley, 22.4 km south-west (66.9%).
The busiest GTR station within 30 km of Plumstead is East Croydon, 17.7 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Plumstead, GTR is the least punctual, at 85.5%.
For GTR, Plumstead is the 121st best of 307 ranked stations. Its 85.5% here is 2.6 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Plumstead are near its usual level: 6.3% of scheduled stops, against 4.7% across its network and 3.0% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,929 | 85.7% | 5.5% |
| Period 6 of 2026-27 | 1,778 | 82.0% | 4.9% |
| Period 5 of 2026-27 | 1,363 | 85.0% | 6.8% |
| Period 4 of 2026-27 | 1,748 | 84.1% | 3.9% |
| Period 3 of 2026-27 | 1,257 | 83.3% | 6.0% |
| Period 2 of 2026-27 | 1,878 | 85.7% | 5.3% |
| Period 1 of 2026-27 | 2,026 | 88.8% | 4.6% |
| Period 13 of 2025-26 | 2,126 | 88.3% | 3.1% |
| Period 12 of 2025-26 | 1,737 | 83.6% | 7.8% |
| Period 11 of 2025-26 | 1,797 | 86.7% | 8.7% |
| Period 10 of 2025-26 | 1,789 | 89.8% | 8.7% |
| Period 9 of 2025-26 | 1,837 | 83.9% | 10.5% |
| Period 8 of 2025-26 | 1,829 | 82.4% | 7.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Plumstead
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 56,562 | 90.9% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out