LNER at Peterborough
All trains at PeterboroughLNER across BritainEast of England
How this operator is doing here
LNER had 36,463 scheduled stops at Peterborough in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 65.9% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
LNER trains at Peterborough also serve Huntingdon (27.6 km south, – on time, – cancelled), Grantham (45.4 km north-west, 62.1% on time, 3.0% cancelled), Sandy (50.0 km south, – on time, – cancelled), Bedford (51.2 km south, – on time, – cancelled), Newark Northgate (67.4 km north-west, 65.8% on time, 2.9% cancelled) and Stevenage (74.9 km south, 65.9% on time, 3.3% cancelled), which are the stations on its network closest to Peterborough.
The busiest LNER station within 30 km of Peterborough is Huntingdon, 27.6 km south, with about 0 scheduled stops a day.
LNER ranks 4th of the 6 operators with enough records at Peterborough, on 65.9%.
For LNER, Peterborough is the 18th best of 35 ranked stations. Its 65.9% here is 1.7 percentage points below the 67.6% across the whole network.
LNER at Peterborough has slipped sharply. 65.9% of stops came within three minutes of the timetable in the latest 13 periods, 5.0 percentage points worse than the 70.9% recorded in the 13 before. Cancellations rose to 2.8% of scheduled stops from 1.9%, which is 0.9 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,739 | 66.1% | 1.2% |
| Period 6 of 2026-27 | 2,807 | 60.8% | 3.1% |
| Period 5 of 2026-27 | 2,877 | 59.9% | 4.1% |
| Period 4 of 2026-27 | 2,837 | 62.0% | 1.9% |
| Period 3 of 2026-27 | 2,679 | 61.9% | 2.4% |
| Period 2 of 2026-27 | 2,804 | 63.5% | 3.7% |
| Period 1 of 2026-27 | 3,250 | 65.0% | 4.1% |
| Period 13 of 2025-26 | 2,969 | 71.7% | 2.4% |
| Period 12 of 2025-26 | 2,769 | 69.2% | 2.8% |
| Period 11 of 2025-26 | 2,808 | 67.3% | 3.3% |
| Period 10 of 2025-26 | 2,509 | 66.9% | 2.2% |
| Period 9 of 2025-26 | 2,723 | 69.0% | 3.5% |
| Period 8 of 2025-26 | 2,692 | 73.6% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Peterborough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 29,634 | 79.8% | 4.5% |
| East Midlands Railway | 19,568 | 70.5% | 3.0% |
| CrossCountry | 11,638 | 56.7% | 3.2% |
| Greater Anglia | 5,338 | 75.3% | 2.0% |
| Grand Central | 1,224 | 55.5% | 2.6% |
| Hull Trains | 12 | – | – |
| Lumo (East Coast) | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out