GTR had 29,634 scheduled stops at Peterborough in the 13 periods to Period 7 of 2026-27, 29% of the station's total. 79.8% of recorded arrivals came within three minutes and 4.5% of stops were cancelled.
GTR trains at Peterborough also serve Huntingdon (27.6 km south, 79.9% on time, 6.0% cancelled), St Neots (38.2 km south, 82.3% on time, 5.9% cancelled), Littleport (40.3 km east, 65.2% on time, 9.9% cancelled), Ely (40.5 km south-east, 66.9% on time, 10.7% cancelled), Downham Market (41.7 km east, 64.2% on time, 10.0% cancelled) and Watlington (44.1 km east, 62.7% on time, 10.0% cancelled), which are the stations on its network closest to Peterborough.
The busiest GTR station within 30 km of Peterborough is Huntingdon, 27.6 km south, with about 81 scheduled stops a day.
Of the 6 operators with enough records at Peterborough, GTR is the most punctual, at 79.8%.
For GTR, Peterborough is the 210th best of 307 ranked stations. Its 79.8% here is 3.1 percentage points below the 82.9% across the whole network.
Cancellations of GTR at Peterborough are near its usual level: 4.5% of scheduled stops, against 4.7% across its network and 3.3% for every operator at the station.
GTR at Peterborough has not moved in one direction over three full railway years: 78.9% within three minutes in 2023-24, 78.8% in 2024-25 and 81.3% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,308 | 76.9% | 3.2% |
| Period 6 of 2026-27 | 2,237 | 74.2% | 6.5% |
| Period 5 of 2026-27 | 2,291 | 75.0% | 6.5% |
| Period 4 of 2026-27 | 2,315 | 75.3% | 7.3% |
| Period 3 of 2026-27 | 2,307 | 76.8% | 5.5% |
| Period 2 of 2026-27 | 2,305 | 82.3% | 4.9% |
| Period 1 of 2026-27 | 2,663 | 82.7% | 4.5% |
| Period 13 of 2025-26 | 2,515 | 86.5% | 1.3% |
| Period 12 of 2025-26 | 2,003 | 83.1% | 1.6% |
| Period 11 of 2025-26 | 2,163 | 81.8% | 3.2% |
| Period 10 of 2025-26 | 2,049 | 81.9% | 3.3% |
| Period 9 of 2025-26 | 2,177 | 77.5% | 7.4% |
| Period 8 of 2025-26 | 2,301 | 81.9% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Peterborough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 36,463 | 65.9% | 2.8% |
| East Midlands Railway | 19,568 | 70.5% | 3.0% |
| CrossCountry | 11,638 | 56.7% | 3.2% |
| Greater Anglia | 5,338 | 75.3% | 2.0% |
| Grand Central | 1,224 | 55.5% | 2.6% |
| Hull Trains | 12 | – | – |
| Lumo (East Coast) | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out