Greater Anglia at Peterborough
All trains at PeterboroughGreater Anglia across BritainEast of England
How this operator is doing here
Greater Anglia had 5,338 scheduled stops at Peterborough in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 75.3% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Greater Anglia trains at Peterborough also serve Whittlesea (9.4 km east, 67.1% on time, 2.0% cancelled), March (23.1 km east, 70.2% on time, 2.0% cancelled), Manea (30.2 km east, 67.3% on time, 2.0% cancelled), Ely (40.5 km south-east, 79.1% on time, 1.9% cancelled), Waterbeach (46.1 km south-east, 76.9% on time, 4.4% cancelled) and Soham (47.4 km south-east, 66.8% on time, 0.8% cancelled), which are the stations on its network closest to Peterborough.
The busiest Greater Anglia station within 30 km of Peterborough is Whittlesea, 9.4 km east, with about 15 scheduled stops a day.
Greater Anglia ranks 2nd of the 6 operators with enough records at Peterborough, on 75.3%.
Greater Anglia at Peterborough has slipped sharply. 75.3% of stops came within three minutes of the timetable in the latest 13 periods, 5.7 percentage points worse than the 81.0% recorded in the 13 before. Cancellations held steady at 2.0% of scheduled stops, against 1.8% before.
Over three full railway years Greater Anglia at Peterborough has got worse each time, from 85.4% within three minutes in 2023-24 to 84.5% in 2024-25 and 80.6% in 2025-26.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 382 | 51.6% | 2.6% |
| Period 6 of 2026-27 | 432 | 38.1% | 4.6% |
| Period 5 of 2026-27 | 436 | 66.4% | 2.5% |
| Period 4 of 2026-27 | 420 | 82.7% | 2.4% |
| Period 3 of 2026-27 | 420 | 74.3% | 1.7% |
| Period 2 of 2026-27 | 348 | 85.3% | 2.3% |
| Period 1 of 2026-27 | 448 | 91.4% | 1.8% |
| Period 13 of 2025-26 | 466 | 88.3% | 0.9% |
| Period 12 of 2025-26 | 424 | 87.9% | 2.6% |
| Period 11 of 2025-26 | 424 | 86.0% | 0.9% |
| Period 10 of 2025-26 | 388 | 80.6% | 0.5% |
| Period 9 of 2025-26 | 414 | 75.2% | 1.4% |
| Period 8 of 2025-26 | 336 | 67.0% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Peterborough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 36,463 | 65.9% | 2.8% |
| GTR | 29,634 | 79.8% | 4.5% |
| East Midlands Railway | 19,568 | 70.5% | 3.0% |
| CrossCountry | 11,638 | 56.7% | 3.2% |
| Grand Central | 1,224 | 55.5% | 2.6% |
| Hull Trains | 12 | – | – |
| Lumo (East Coast) | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out