Grand Central at Peterborough
All trains at PeterboroughGrand Central across BritainEast of England
How this operator is doing here
Grand Central had 1,224 scheduled stops at Peterborough in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 55.5% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Grand Central trains at Peterborough also serve Huntingdon (27.6 km south, – on time, – cancelled), Grantham (45.4 km north-west, – on time, – cancelled), Sandy (50.0 km south, – on time, – cancelled), Biggleswade (54.4 km south, – on time, – cancelled), Newark Northgate (67.4 km north-west, – on time, – cancelled) and Hitchin (69.1 km south, – on time, – cancelled), which are the stations on its network closest to Peterborough.
The busiest Grand Central station within 30 km of Peterborough is Huntingdon, 27.6 km south, with about 0 scheduled stops a day.
Of the 6 operators with enough records at Peterborough, Grand Central is the least punctual, at 55.5%.
For Grand Central, Peterborough is the 16th best of 17 ranked stations. Its 55.5% here is 6.7 percentage points below the 62.2% across the whole network.
Grand Central at Peterborough has slipped a little, from 58.4% within three minutes in the previous 13 periods to 55.5% in the latest 13, a fall of 2.9 percentage points. Cancellations held steady at 2.6% of scheduled stops, against 2.3% before.
Period by period
See how Grand Central Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 96 | 62.6% | 5.2% |
| Period 6 of 2026-27 | 96 | 45.3% | 1.0% |
| Period 5 of 2026-27 | 98 | 54.8% | 5.1% |
| Period 4 of 2026-27 | 97 | 46.2% | 4.1% |
| Period 3 of 2026-27 | 96 | 59.1% | 3.1% |
| Period 2 of 2026-27 | 83 | 50.0% | 1.2% |
| Period 1 of 2026-27 | 110 | 58.9% | 2.7% |
| Period 13 of 2025-26 | 101 | 67.3% | 0.0% |
| Period 12 of 2025-26 | 84 | 61.0% | 2.4% |
| Period 11 of 2025-26 | 95 | 60.9% | 3.2% |
| Period 10 of 2025-26 | 81 | 47.5% | 1.2% |
| Period 9 of 2025-26 | 93 | 47.3% | 2.2% |
| Period 8 of 2025-26 | 94 | 58.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Peterborough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 36,463 | 65.9% | 2.8% |
| GTR | 29,634 | 79.8% | 4.5% |
| East Midlands Railway | 19,568 | 70.5% | 3.0% |
| CrossCountry | 11,638 | 56.7% | 3.2% |
| Greater Anglia | 5,338 | 75.3% | 2.0% |
| Hull Trains | 12 | – | – |
| Lumo (East Coast) | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out