How this station is performing
Easterhouse had 43,469 scheduled stops to Period 7 of 2026-27, about 119 a day. 88.8% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Easterhouse opened on 23 November 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Gartcosh is the oldest (1831) and Garrowhill the newest (1936), with Easterhouse in between.
The nearest stations to Easterhouse are Garrowhill (1.5 km west), Baillieston (1.8 km south), Bargeddie (2.3 km south-east), Mount Vernon (2.7 km south-west) and Gartcosh (3.3 km north-east). 46 stations lie within 10 km in all. At 88.8%, Easterhouse is more punctual than every one of them; the best of the five, Garrowhill, manages 88.2%.
For Easterhouse, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 81.1% of stops arrived within three minutes of the timetable. The strongest was Period 4 of 2023-24, at 98.7%, which is 17.6 percentage points higher. Cancellations peaked at 5.4% of scheduled stops in Period 11 of 2023-24, against 1.9% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Easterhouse on 88.8%. The comparison group includes Garrowhill (88.2%), Perth (82.7%) and Crossmyloof (95.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 43,469 | 88.8% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Easterhouse? Delay Repay
These operators call at Easterhouse and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,304 | 87.5% | 1.5% |
| Period 6 of 2026-27 | 3,307 | 90.6% | 1.5% |
| Period 5 of 2026-27 | 3,310 | 91.3% | 1.7% |
| Period 4 of 2026-27 | 3,305 | 90.8% | 3.2% |
| Period 3 of 2026-27 | 3,306 | 91.4% | 1.1% |
| Period 2 of 2026-27 | 3,304 | 90.1% | 1.4% |
| Period 1 of 2026-27 | 3,812 | 89.9% | 1.2% |
| Period 13 of 2025-26 | 3,621 | 90.5% | 1.4% |
| Period 12 of 2025-26 | 3,304 | 90.6% | 2.2% |
| Period 11 of 2025-26 | 3,304 | 89.4% | 1.6% |
| Period 10 of 2025-26 | 2,984 | 87.2% | 1.7% |
| Period 9 of 2025-26 | 3,304 | 81.1% | 2.5% |
| Period 8 of 2025-26 | 3,304 | 83.0% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Garrowhill | 43,469 | 88.2% | 1.9% |
| Perth | 43,264 | 82.7% | 1.2% |
| Crossmyloof | 43,917 | 95.8% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out