Garrowhill
GARScotlandManaged by ScotRail
How this station is performing
Garrowhill had 43,469 scheduled stops to Period 7 of 2026-27, about 119 a day. 88.2% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Garrowhill opened on 16 March 1936, 90 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Garrowhill is the newest; the oldest, Baillieston, opened in 1866.
The nearest stations to Garrowhill are Easterhouse (1.5 km east), Baillieston (1.6 km south-east), Mount Vernon (1.7 km south), Shettleston (1.9 km west) and Carmyle (2.9 km south-west). 54 stations lie within 10 km in all. Of the five, Easterhouse is the most punctual at 88.8% and Carmyle the least at 70.9%, with Garrowhill on 88.2%.
Across the whole run of data, the weakest four-week period for Garrowhill was Period 8 of 2024-25, at 74.4%, some time before the latest year. The strongest was Period 4 of 2023-24, at 92.7%, and the two are 18.3 percentage points apart. Cancellations peaked at 5.3% of scheduled stops in Period 11 of 2023-24, against 1.9% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Garrowhill on 88.2%. The comparison group includes Easterhouse (88.8%), Perth (82.7%) and Crossmyloof (95.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 43,469 | 88.2% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Garrowhill? Delay Repay
These operators call at Garrowhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,304 | 86.3% | 1.5% |
| Period 6 of 2026-27 | 3,307 | 90.6% | 1.5% |
| Period 5 of 2026-27 | 3,310 | 91.1% | 1.7% |
| Period 4 of 2026-27 | 3,305 | 90.8% | 3.2% |
| Period 3 of 2026-27 | 3,306 | 91.5% | 1.1% |
| Period 2 of 2026-27 | 3,304 | 89.2% | 1.4% |
| Period 1 of 2026-27 | 3,812 | 89.7% | 1.2% |
| Period 13 of 2025-26 | 3,621 | 89.9% | 1.4% |
| Period 12 of 2025-26 | 3,304 | 89.2% | 2.2% |
| Period 11 of 2025-26 | 3,304 | 88.6% | 1.6% |
| Period 10 of 2025-26 | 2,984 | 86.2% | 1.7% |
| Period 9 of 2025-26 | 3,304 | 81.5% | 2.5% |
| Period 8 of 2025-26 | 3,304 | 81.8% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Easterhouse | 43,469 | 88.8% | 1.9% |
| Perth | 43,264 | 82.7% | 1.2% |
| Crossmyloof | 43,917 | 95.8% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out