Paisley Canal
PCNScotlandManaged by ScotRail
How this station is performing
Paisley Canal had 20,167 scheduled stops to Period 7 of 2026-27, about 55 a day. 93.6% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Paisley Canal opened on 1 July 1885 and closed to passengers on 10 January 1983. It reopened on 30 July 1990, 36 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Paisley Gilmour Street is the oldest (1840) and Hillington West the newest (1940), with Paisley Canal in between.
The nearest stations to Paisley Canal are Paisley Gilmour Street (0.8 km north), Hawkhead (1.5 km east), Paisley St James (1.8 km north-west), Crookston (3.6 km east) and Hillington West (3.7 km north-east). 53 stations lie within 10 km in all. Of the five, Hillington West is the most punctual at 96.3% and Hawkhead the least at 92.2%, with Paisley Canal on 93.6%.
Paisley Canal is named after Paisley, a town, home to about 77,220 people, but the station stands 0.6 km from its centre.
Compared with 3 stations of a similar size in Scotland, Paisley Canal is the most punctual, at 93.6%. The comparison group includes Corkerhill (92.8%), Crookston (92.6%) and Hawkhead (92.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,167 | 93.6% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Paisley Canal? Delay Repay
These operators call at Paisley Canal and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,624 | 94.5% | 1.2% |
| Period 6 of 2026-27 | 1,624 | 96.3% | 0.5% |
| Period 5 of 2026-27 | 1,624 | 96.2% | 0.7% |
| Period 4 of 2026-27 | 1,456 | 94.6% | 1.2% |
| Period 3 of 2026-27 | 1,616 | 95.0% | 1.9% |
| Period 2 of 2026-27 | 1,624 | 91.2% | 1.6% |
| Period 1 of 2026-27 | 1,880 | 94.7% | 2.5% |
| Period 13 of 2025-26 | 832 | 95.6% | 1.4% |
| Period 12 of 2025-26 | 1,624 | 93.2% | 0.9% |
| Period 11 of 2025-26 | 1,624 | 94.6% | 0.5% |
| Period 10 of 2025-26 | 1,388 | 91.8% | 2.1% |
| Period 9 of 2025-26 | 1,627 | 89.9% | 4.9% |
| Period 8 of 2025-26 | 1,624 | 90.2% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Corkerhill | 20,167 | 92.8% | 1.4% |
| Crookston | 20,167 | 92.6% | 1.6% |
| Hawkhead | 20,167 | 92.2% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out