Hawkhead
HKHScotlandManaged by ScotRail
How this station is performing
Hawkhead had 20,167 scheduled stops to Period 7 of 2026-27, about 55 a day. 92.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Hawkhead opened on 1 May 1894 and closed to passengers on 14 February 1966. It reopened on 12 April 1991, 35 years before the latest figures. The First World War closed Hawkhead on 1 January 1917, and it reopened on 10 February 1919. Among the 5 stations nearest to it with a known opening date, Paisley Gilmour Street is the oldest (1840) and Hillington West the newest (1940), with Hawkhead in between.
The nearest stations to Hawkhead are Paisley Canal (1.5 km west), Paisley Gilmour Street (1.7 km west), Crookston (2.1 km east), Hillington West (2.3 km north-east) and Paisley St James (2.9 km north-west). 64 stations lie within 10 km in all. At 92.2%, Hawkhead is less punctual than all of them; the best of the five, Hillington West, manages 96.3%.
Hawkhead takes its name from a suburb called Hawkhead, and the station stands 1.3 km from its centre.
Compared with 3 stations of a similar size in Scotland, Hawkhead is the least punctual, at 92.2%. All of them are ahead, including Corkerhill (92.8%), Crookston (92.6%) and Mosspark (93.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,167 | 92.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Hawkhead? Delay Repay
These operators call at Hawkhead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,624 | 93.6% | 1.2% |
| Period 6 of 2026-27 | 1,624 | 95.1% | 0.6% |
| Period 5 of 2026-27 | 1,624 | 95.0% | 0.7% |
| Period 4 of 2026-27 | 1,456 | 93.2% | 1.2% |
| Period 3 of 2026-27 | 1,616 | 93.9% | 1.9% |
| Period 2 of 2026-27 | 1,624 | 89.9% | 1.6% |
| Period 1 of 2026-27 | 1,880 | 93.4% | 2.5% |
| Period 13 of 2025-26 | 832 | 94.3% | 1.4% |
| Period 12 of 2025-26 | 1,624 | 91.7% | 0.9% |
| Period 11 of 2025-26 | 1,624 | 92.6% | 0.5% |
| Period 10 of 2025-26 | 1,388 | 89.3% | 2.1% |
| Period 9 of 2025-26 | 1,627 | 87.8% | 4.9% |
| Period 8 of 2025-26 | 1,624 | 88.7% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Corkerhill | 20,167 | 92.8% | 1.4% |
| Crookston | 20,167 | 92.6% | 1.6% |
| Mosspark | 20,167 | 93.8% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out