Heathrow Terminals 2 and 3 (Rail Station Only)
HXXLondonManaged by Heathrow Express
How this station is performing
Heathrow Terminals 2 and 3 (Rail Station Only) had 131,842 scheduled stops to Period 7 of 2026-27, about 362 a day. 87.9% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Heathrow Terminals 2 and 3 (Rail Station Only) opened on 25 May 1998, 28 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ashford (Surrey) is the oldest (1848) and Heathrow Terminal 5 (Rail Station Only) the newest (2008), with Heathrow Terminals 2 and 3 (Rail Station Only) in between.
The nearest stations to Heathrow Terminals 2 and 3 (Rail Station Only) are Heathrow Terminal 4 (Rail Station Only) (1.5 km south), Heathrow Terminal 5 (Rail Station Only) (2.3 km west), Ashford (Surrey) (4.1 km south), Feltham (4.1 km south-east) and Hayes and Harlington (4.2 km north-east). 30 stations lie within 10 km in all. Of the five, Heathrow Terminal 5 (Rail Station Only) is the most punctual at 91.2% and Hayes and Harlington the least at 85.4%, with Heathrow Terminals 2 and 3 (Rail Station Only) on 87.9%.
2 operators call at Heathrow Terminals 2 and 3 (Rail Station Only): Elizabeth line (88.0%, 58% of stops) and Heathrow Express (87.8%, 42% of stops). They are close together, with Elizabeth line leading on 88.0% and Heathrow Express trailing on 87.8%, a gap of 0.2 percentage points.
Compared with 3 stations of a similar size in London, Heathrow Terminals 2 and 3 (Rail Station Only) is the most punctual, at 87.9%. The comparison group includes Sutton (London) (87.2%), Orpington (80.2%) and Ealing Broadway (82.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 77,095 | 88.0% | 6.2% |
| Heathrow Express | 54,747 | 87.8% | 4.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,159 | 88.7% | 3.5% |
| Period 6 of 2026-27 | 9,286 | 85.7% | 5.5% |
| Period 5 of 2026-27 | 10,279 | 87.2% | 11.3% |
| Period 4 of 2026-27 | 10,179 | 89.2% | 2.7% |
| Period 3 of 2026-27 | 9,892 | 88.8% | 10.0% |
| Period 2 of 2026-27 | 10,198 | 88.9% | 5.0% |
| Period 1 of 2026-27 | 11,385 | 89.2% | 4.5% |
| Period 13 of 2025-26 | 11,037 | 89.9% | 2.7% |
| Period 12 of 2025-26 | 10,099 | 89.4% | 3.4% |
| Period 11 of 2025-26 | 10,061 | 88.7% | 6.8% |
| Period 10 of 2025-26 | 9,893 | 89.3% | 3.7% |
| Period 9 of 2025-26 | 9,423 | 83.3% | 4.9% |
| Period 8 of 2025-26 | 9,951 | 83.3% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sutton (London) | 131,080 | 87.2% | 4.2% |
| Orpington | 133,035 | 80.2% | 1.9% |
| Ealing Broadway | 133,358 | 82.9% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out