Southeastern at Orpington
How this operator is doing here
Southeastern had 125,300 scheduled stops at Orpington in the 13 periods to Period 7 of 2026-27, 94% of the station's total. 80.1% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Southeastern trains at Orpington also serve Petts Wood (2.0 km north-west, 84.2% on time, 1.5% cancelled), Chelsfield (2.3 km south-east, 80.2% on time, 1.4% cancelled), St Mary Cray (2.6 km north-east, 81.7% on time, 1.3% cancelled), Chislehurst (4.2 km north-west, 91.0% on time, 1.2% cancelled), Knockholt (4.2 km south-east, 81.0% on time, 1.4% cancelled) and Bickley (4.3 km north-west, 84.6% on time, 2.0% cancelled), which are the stations on its network closest to Orpington.
Within 30 km of here, Southeastern runs best at Sundridge Park, 6.5 km north-west (99.4%), and worst at Hildenborough, 20.1 km south-east (70.3%).
The busiest Southeastern station within 30 km of Orpington is London Bridge, 19.0 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Orpington, Southeastern is the least punctual, at 80.1%.
For Southeastern, Orpington is the 119th best of 173 ranked stations. Its 80.1% here is 4.1 percentage points below the 84.2% across the whole network.
Over three full railway years Southeastern at Orpington has got worse each time, from 83.8% within three minutes in 2023-24 to 82.3% in 2024-25 and 81.9% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,695 | 75.9% | 1.4% |
| Period 6 of 2026-27 | 9,708 | 72.6% | 1.7% |
| Period 5 of 2026-27 | 8,838 | 77.3% | 2.3% |
| Period 4 of 2026-27 | 9,613 | 81.5% | 1.5% |
| Period 3 of 2026-27 | 9,796 | 80.0% | 2.6% |
| Period 2 of 2026-27 | 9,401 | 84.0% | 2.2% |
| Period 1 of 2026-27 | 11,028 | 86.5% | 1.3% |
| Period 13 of 2025-26 | 10,594 | 84.4% | 1.5% |
| Period 12 of 2025-26 | 9,760 | 83.5% | 0.9% |
| Period 11 of 2025-26 | 9,602 | 82.4% | 1.1% |
| Period 10 of 2025-26 | 7,937 | 78.5% | 2.4% |
| Period 9 of 2025-26 | 9,614 | 75.9% | 1.5% |
| Period 8 of 2025-26 | 9,714 | 76.9% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Orpington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 7,735 | 81.0% | 5.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out