GTR at Orpington
How this operator is doing here
GTR had 7,735 scheduled stops at Orpington in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 81.0% of recorded arrivals came within three minutes and 5.9% of stops were cancelled.
GTR trains at Orpington also serve Petts Wood (2.0 km north-west, 84.3% on time, 5.8% cancelled), St Mary Cray (2.6 km north-east, 91.1% on time, 3.0% cancelled), Bickley (4.3 km north-west, 87.4% on time, 3.4% cancelled), Bromley South (5.7 km north-west, 87.8% on time, 3.2% cancelled), Swanley (5.9 km east, 88.0% on time, 3.0% cancelled) and Shortlands (7.0 km north-west, 89.8% on time, 3.6% cancelled), which are the stations on its network closest to Orpington.
Within 30 km of here, GTR runs best at Beckenham Junction, 9.0 km north-west (98.1%), and worst at Kenley, 14.3 km west (66.9%).
The busiest GTR station within 30 km of Orpington is East Croydon, 12.7 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Orpington, GTR is the most punctual, at 81.0%.
For GTR, Orpington is the 191st best of 307 ranked stations. Its 81.0% here is 1.9 percentage points below the 82.9% across the whole network.
Cancellations of GTR at Orpington are near its usual level: 5.9% of scheduled stops, against 4.7% across its network and 1.9% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 641 | 82.1% | 3.9% |
| Period 6 of 2026-27 | 680 | 81.0% | 6.9% |
| Period 5 of 2026-27 | 569 | 76.9% | 4.2% |
| Period 4 of 2026-27 | 570 | 79.5% | 3.2% |
| Period 3 of 2026-27 | 573 | 81.1% | 7.5% |
| Period 2 of 2026-27 | 511 | 85.8% | 9.2% |
| Period 1 of 2026-27 | 739 | 88.9% | 1.1% |
| Period 13 of 2025-26 | 689 | 86.1% | 3.6% |
| Period 12 of 2025-26 | 566 | 78.1% | 5.7% |
| Period 11 of 2025-26 | 574 | 76.2% | 5.6% |
| Period 10 of 2025-26 | 349 | 75.9% | 16.9% |
| Period 9 of 2025-26 | 698 | 80.6% | 10.7% |
| Period 8 of 2025-26 | 576 | 75.4% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Orpington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 125,300 | 80.1% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out