LNER at Northallerton
All trains at NorthallertonLNER across BritainYorkshire and The Humber
How this operator is doing here
LNER had 12,047 scheduled stops at Northallerton in the 13 periods to Period 7 of 2026-27, 39% of the station's total. 63.5% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
LNER trains at Northallerton also serve Thirsk (12.4 km south, – on time, – cancelled), Darlington (22.0 km north, 65.1% on time, 1.9% cancelled), Thornaby (26.8 km north, – on time, – cancelled), Middlesbrough (30.5 km north-east, – on time, – cancelled), Harrogate (38.2 km south, 87.5% on time, 6.1% cancelled) and York (47.4 km south-east, 61.6% on time, 2.7% cancelled), which are the stations on its network closest to Northallerton.
The busiest LNER station within 30 km of Northallerton is Darlington, 22.0 km north, with about 67 scheduled stops a day.
LNER ranks 2nd of the 3 operators with enough records at Northallerton, on 63.5%.
For LNER, Northallerton is the 25th best of 35 ranked stations. Its 63.5% here is 4.1 percentage points below the 67.6% across the whole network.
LNER at Northallerton has slipped a little, from 68.0% within three minutes in the previous 13 periods to 63.5% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 2.6% of scheduled stops from 1.5%, which is 1.1 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 935 | 62.9% | 1.3% |
| Period 6 of 2026-27 | 942 | 62.2% | 4.4% |
| Period 5 of 2026-27 | 934 | 61.4% | 3.2% |
| Period 4 of 2026-27 | 939 | 63.6% | 1.2% |
| Period 3 of 2026-27 | 940 | 63.8% | 3.2% |
| Period 2 of 2026-27 | 953 | 63.7% | 1.8% |
| Period 1 of 2026-27 | 1,080 | 61.7% | 2.7% |
| Period 13 of 2025-26 | 844 | 64.5% | 1.9% |
| Period 12 of 2025-26 | 935 | 71.7% | 4.0% |
| Period 11 of 2025-26 | 939 | 64.9% | 2.6% |
| Period 10 of 2025-26 | 846 | 59.2% | 1.9% |
| Period 9 of 2025-26 | 914 | 63.3% | 3.2% |
| Period 8 of 2025-26 | 846 | 62.9% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Northallerton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 14,874 | 68.6% | 2.3% |
| Grand Central | 3,948 | 60.4% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out