Grand Central at Northallerton
All trains at NorthallertonGrand Central across BritainYorkshire and The Humber
How this operator is doing here
Grand Central had 3,948 scheduled stops at Northallerton in the 13 periods to Period 7 of 2026-27, 13% of the station's total. 60.4% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Grand Central trains at Northallerton also serve Thirsk (12.4 km south, 65.9% on time, 1.7% cancelled), Darlington (22.0 km north, – on time, – cancelled), Eaglescliffe (22.8 km north, 57.9% on time, 2.0% cancelled), Hartlepool (42.2 km north, 61.3% on time, 2.2% cancelled), York (47.4 km south-east, 59.5% on time, 2.2% cancelled) and Seaham (56.7 km north, 67.3% on time, 1.9% cancelled), which are the stations on its network closest to Northallerton.
The busiest Grand Central station within 30 km of Northallerton is Eaglescliffe, 22.8 km north, with about 11 scheduled stops a day.
Of the 3 operators with enough records at Northallerton, Grand Central is the least punctual, at 60.4%.
For Grand Central, Northallerton is the 10th best of 17 ranked stations. Its 60.4% here is 1.8 percentage points below the 62.2% across the whole network.
Grand Central at Northallerton has slipped a little, from 64.9% within three minutes in the previous 13 periods to 60.4% in the latest 13, a fall of 4.5 percentage points. Cancellations held steady at 1.8% of scheduled stops, against 1.9% before.
Period by period
See how Grand Central Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 327 | 60.1% | 2.8% |
| Period 6 of 2026-27 | 316 | 58.3% | 2.2% |
| Period 5 of 2026-27 | 327 | 58.4% | 2.4% |
| Period 4 of 2026-27 | 323 | 57.0% | 0.0% |
| Period 3 of 2026-27 | 328 | 57.9% | 1.5% |
| Period 2 of 2026-27 | 269 | 52.3% | 2.6% |
| Period 1 of 2026-27 | 363 | 58.1% | 2.5% |
| Period 13 of 2025-26 | 286 | 70.3% | 0.0% |
| Period 12 of 2025-26 | 257 | 65.4% | 1.2% |
| Period 11 of 2025-26 | 315 | 70.8% | 1.0% |
| Period 10 of 2025-26 | 282 | 59.6% | 1.4% |
| Period 9 of 2025-26 | 293 | 62.7% | 3.1% |
| Period 8 of 2025-26 | 262 | 54.5% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Northallerton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 14,874 | 68.6% | 2.3% |
| LNER | 12,047 | 63.5% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out