Northallerton
NTRYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Northallerton had 30,869 scheduled stops to Period 7 of 2026-27, about 85 a day. 65.6% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Northallerton opened on 31 March 1841, 185 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Dinsdale is the oldest (1825) and Teesside Airport the newest (1971), with Northallerton in between.
Northallerton is remote: its nearest neighbours are Thirsk (12.4 km south), Yarm (18.9 km north), Dinsdale (20.3 km north), Teesside Airport (20.7 km north) and Allens West (22.0 km north). Of the five, Allens West is the most punctual at 88.8% and Yarm the least at 61.4%, with Northallerton on 65.6%.
Northallerton takes its name from a market town called Northallerton, home to about 15,741 people, and the station stands 1.0 km from its centre.
3 operators call at Northallerton: TransPennine Express (68.6%, 48% of stops), LNER (63.5%, 39% of stops) and Grand Central (60.4%, 13% of stops). The operator you travel with matters: TransPennine Express reaches 68.6% within three minutes while Grand Central manages 60.4%, a gap of 8.2 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Northallerton is the least punctual, at 65.6%. All of them are ahead, including Rotherham Central (77.6%), Brighouse (76.2%) and Swinton (South Yorks) (78.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 14,874 | 68.6% | 2.3% |
| LNER | 12,047 | 63.5% | 2.6% |
| Grand Central | 3,948 | 60.4% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Northallerton? Delay Repay
These operators call at Northallerton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,378 | 64.2% | 1.9% |
| Period 6 of 2026-27 | 2,365 | 65.2% | 2.7% |
| Period 5 of 2026-27 | 2,371 | 63.2% | 3.0% |
| Period 4 of 2026-27 | 2,380 | 64.3% | 1.2% |
| Period 3 of 2026-27 | 2,383 | 69.7% | 1.8% |
| Period 2 of 2026-27 | 2,325 | 63.8% | 2.7% |
| Period 1 of 2026-27 | 2,716 | 64.4% | 2.6% |
| Period 13 of 2025-26 | 2,135 | 69.2% | 1.5% |
| Period 12 of 2025-26 | 2,309 | 71.5% | 2.3% |
| Period 11 of 2025-26 | 2,386 | 70.3% | 2.1% |
| Period 10 of 2025-26 | 2,159 | 65.4% | 1.3% |
| Period 9 of 2025-26 | 2,407 | 60.9% | 3.0% |
| Period 8 of 2025-26 | 2,555 | 61.0% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rotherham Central | 30,742 | 77.6% | 3.3% |
| Brighouse | 30,485 | 76.2% | 2.5% |
| Swinton (South Yorks) | 30,218 | 78.0% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out