Swinton (South Yorks)
SWNYorkshire and The HumberManaged by Northern Trains
How this station is performing
Swinton (South Yorks) had 30,218 scheduled stops to Period 7 of 2026-27, about 83 a day. 78.0% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Swinton (South Yorks) opened on 1 July 1840 and closed to passengers on 1 January 1968. It reopened on 14 May 1990, 36 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Swinton (South Yorks) is the oldest; the next oldest, Conisbrough, dates from 1849.
The nearest stations to Swinton (South Yorks) are Mexborough (1.3 km north-east), Bolton-upon-Dearne (3.7 km north), Conisbrough (4.7 km east), Goldthorpe (5.4 km north) and Thurnscoe (6.7 km north). 8 stations lie within 10 km in all. Of the five, Conisbrough is the most punctual at 82.3% and Bolton-upon-Dearne the least at 71.8%, with Swinton (South Yorks) on 78.0%.
Swinton (South Yorks) is named after Swinton, a town, home to about 15,559 people, but the station stands 0.7 km from its centre.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Swinton (South Yorks) is the most punctual, at 78.0%. The comparison group includes Brighouse (76.2%), Rotherham Central (77.6%) and Northallerton (65.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 30,218 | 78.0% | 2.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,348 | 80.3% | 1.2% |
| Period 6 of 2026-27 | 2,344 | 80.0% | 1.9% |
| Period 5 of 2026-27 | 2,360 | 77.9% | 3.8% |
| Period 4 of 2026-27 | 2,360 | 77.9% | 5.0% |
| Period 3 of 2026-27 | 2,356 | 76.8% | 2.7% |
| Period 2 of 2026-27 | 2,048 | 75.1% | 1.1% |
| Period 1 of 2026-27 | 2,709 | 81.9% | 1.8% |
| Period 13 of 2025-26 | 2,600 | 82.0% | 1.0% |
| Period 12 of 2025-26 | 2,268 | 79.3% | 1.8% |
| Period 11 of 2025-26 | 2,200 | 75.7% | 2.4% |
| Period 10 of 2025-26 | 2,075 | 77.3% | 4.1% |
| Period 9 of 2025-26 | 2,284 | 71.7% | 3.8% |
| Period 8 of 2025-26 | 2,266 | 76.0% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brighouse | 30,485 | 76.2% | 2.5% |
| Rotherham Central | 30,742 | 77.6% | 3.3% |
| Northallerton | 30,869 | 65.6% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out