North Wembley
NWBLondonManaged by London Underground
How this station is performing
North Wembley had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
North Wembley opened on 15 June 1912, 114 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wembley Central is the oldest (1842) and South Kenton the newest (1933), with North Wembley in between.
The nearest stations to North Wembley are South Kenton (0.9 km north), Wembley Central (1.2 km south-east), Sudbury and Harrow Road (1.3 km south-west), Wembley Stadium (1.6 km south-east) and Sudbury Hill Harrow (2.3 km west). 51 stations lie within 10 km in all. At 88.1%, North Wembley is less punctual than all of them; the best of the five, Sudbury Hill Harrow, manages 90.2%.
North Wembley takes its name from an area of London called North Wembley, and the station stands 0.7 km from its centre.
1 of 3 stations of a similar size in London are more punctual than North Wembley on 88.1%. The comparison group includes Harlesden (92.3%), Hatch End (87.0%) and Headstone Lane (87.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 88.1% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 87.5% | 1.6% |
| Period 6 of 2026-27 | 3,879 | 87.0% | 5.0% |
| Period 5 of 2026-27 | 3,769 | 90.0% | 4.8% |
| Period 4 of 2026-27 | 4,051 | 84.1% | 2.7% |
| Period 3 of 2026-27 | 3,930 | 87.0% | 2.3% |
| Period 2 of 2026-27 | 3,901 | 89.1% | 3.6% |
| Period 1 of 2026-27 | 4,074 | 88.4% | 1.8% |
| Period 13 of 2025-26 | 4,356 | 90.1% | 1.3% |
| Period 12 of 2025-26 | 3,907 | 87.7% | 2.4% |
| Period 11 of 2025-26 | 4,032 | 88.3% | 2.8% |
| Period 10 of 2025-26 | 3,734 | 87.9% | 2.7% |
| Period 9 of 2025-26 | 3,764 | 86.8% | 4.0% |
| Period 8 of 2025-26 | 4,048 | 91.1% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harlesden | 51,431 | 92.3% | 2.9% |
| Hatch End | 51,431 | 87.0% | 3.3% |
| Headstone Lane | 51,431 | 87.4% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out