Newton-le-Willows
NLWNorth WestManaged by Northern Trains
How this station is performing
Newton-le-Willows had 50,915 scheduled stops to Period 7 of 2026-27, about 140 a day. 71.7% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Newton-le-Willows opened on 17 September 1830, 196 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Newton-le-Willows is the oldest; the next oldest, Earlestown, dates from 1830.
The nearest stations to Newton-le-Willows are Earlestown (1.7 km west), Garswood (5.5 km north-west), Bryn (5.7 km north-west), St Helens Junction (6.2 km west) and Padgate (6.5 km south-east). 15 stations lie within 10 km in all. Of the five, Garswood is the most punctual at 89.6% and St Helens Junction the least at 68.4%, with Newton-le-Willows on 71.7%.
Newton-le-Willows is one of 2 stations named after a town called Newton-le-Willows, home to about 24,642 people; this one stands 1.4 km from its centre.
3 operators call at Newton-le-Willows: Northern (68.1%, 47% of stops), TransPennine Express (76.2%, 27% of stops) and Transport for Wales (73.6%, 26% of stops). The operator you travel with matters: TransPennine Express reaches 76.2% within three minutes while Northern manages 68.1%, a gap of 8.1 percentage points.
Compared with 3 stations of a similar size in North West, Newton-le-Willows is the least punctual, at 71.7%. All of them are ahead, including Runcorn (73.1%), Headbolt Lane (89.2%) and Blackpool North (82.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,013 | 68.1% | 2.9% |
| TransPennine Express | 13,691 | 76.2% | 3.5% |
| Transport for Wales | 13,211 | 73.6% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Newton-le-Willows? Delay Repay
These operators call at Newton-le-Willows and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,964 | 68.9% | 1.9% |
| Period 6 of 2026-27 | 3,944 | 70.6% | 2.2% |
| Period 5 of 2026-27 | 3,743 | 72.3% | 4.1% |
| Period 4 of 2026-27 | 3,802 | 73.9% | 2.7% |
| Period 3 of 2026-27 | 3,733 | 71.9% | 2.3% |
| Period 2 of 2026-27 | 3,863 | 73.3% | 2.2% |
| Period 1 of 2026-27 | 4,532 | 78.9% | 1.6% |
| Period 13 of 2025-26 | 4,144 | 79.9% | 2.0% |
| Period 12 of 2025-26 | 3,846 | 79.9% | 1.9% |
| Period 11 of 2025-26 | 3,909 | 76.6% | 2.5% |
| Period 10 of 2025-26 | 3,629 | 71.4% | 3.6% |
| Period 9 of 2025-26 | 3,877 | 51.9% | 4.3% |
| Period 8 of 2025-26 | 3,929 | 60.4% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Runcorn | 50,322 | 73.1% | 4.4% |
| Headbolt Lane | 52,049 | 89.2% | 2.1% |
| Blackpool North | 49,656 | 82.2% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out