Headbolt Lane
HBLNorth WestManaged by Merseyrail
How this station is performing
Headbolt Lane had 52,049 scheduled stops to Period 7 of 2026-27, about 143 a day. 89.2% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Headbolt Lane opened on 5 October 2023, 3 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Headbolt Lane is the newest; the oldest, Kirkby (Merseyside), opened in 1848.
The nearest stations to Headbolt Lane are Kirkby (Merseyside) (1.4 km south-west), Maghull (3.5 km north-west), Maghull North (3.7 km north-west), Fazakerley (4.3 km south-west) and Old Roan (4.5 km west). 26 stations lie within 10 km in all. Of the five, Maghull North is the most punctual at 95.9% and Fazakerley the least at 87.6%, with Headbolt Lane on 89.2%.
2 operators call at Headbolt Lane: Merseyrail (89.2%, 83% of stops) and Northern (88.7%, 17% of stops). They are close together, with Merseyrail leading on 89.2% and Northern trailing on 88.7%, a gap of 0.5 percentage points.
1 of 3 stations of a similar size in North West are more punctual than Headbolt Lane on 89.2%. The comparison group includes Salford Central (78.5%), Newton-le-Willows (71.7%) and Ormskirk (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 43,203 | 89.2% | 1.8% |
| Northern | 8,846 | 88.7% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Headbolt Lane? Delay Repay
These operators call at Headbolt Lane and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,980 | 90.6% | 1.8% |
| Period 6 of 2026-27 | 3,999 | 92.5% | 1.2% |
| Period 5 of 2026-27 | 3,980 | 90.6% | 1.3% |
| Period 4 of 2026-27 | 3,938 | 88.4% | 1.8% |
| Period 3 of 2026-27 | 3,763 | 90.3% | 4.6% |
| Period 2 of 2026-27 | 3,993 | 91.0% | 1.8% |
| Period 1 of 2026-27 | 4,444 | 90.8% | 3.7% |
| Period 13 of 2025-26 | 4,367 | 90.8% | 1.4% |
| Period 12 of 2025-26 | 3,987 | 87.3% | 1.1% |
| Period 11 of 2025-26 | 3,998 | 86.7% | 2.3% |
| Period 10 of 2025-26 | 3,618 | 88.8% | 1.4% |
| Period 9 of 2025-26 | 3,977 | 85.2% | 2.0% |
| Period 8 of 2025-26 | 4,005 | 85.7% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Salford Central | 52,928 | 78.5% | 3.0% |
| Newton-le-Willows | 50,915 | 71.7% | 2.7% |
| Ormskirk | 53,564 | 94.1% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out