Transport for Wales at Newton-le-Willows
All trains at Newton-le-WillowsTransport for Wales across BritainNorth West
How this operator is doing here
Transport for Wales had 13,211 scheduled stops at Newton-le-Willows in the 13 periods to Period 7 of 2026-27, 26% of the station's total. 73.6% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
Transport for Wales trains at Newton-le-Willows also serve Earlestown (1.7 km west, 74.5% on time, 1.5% cancelled), Warrington Bank Quay (7.5 km south, 74.4% on time, 1.2% cancelled), Runcorn East (14.4 km south, 75.5% on time, 0.9% cancelled), Runcorn (15.2 km south-west, 86.2% on time, 2.6% cancelled), Eccles (Manchester) (18.8 km east, – on time, – cancelled) and Frodsham (19.0 km south-west, 79.2% on time, 1.7% cancelled), which are the stations on its network closest to Newton-le-Willows.
Within 30 km of here, Transport for Wales runs best at Runcorn, 15.2 km south-west (86.2%), and worst at East Didsbury, 26.4 km east (60.1%).
The busiest Transport for Wales station within 30 km of Newton-le-Willows is Frodsham, 19.0 km south-west, with about 70 scheduled stops a day.
Transport for Wales at Newton-le-Willows has slipped a little, from 76.9% within three minutes in the previous 13 periods to 73.6% in the latest 13, a fall of 3.3 percentage points. Cancellations fell to 1.5% of scheduled stops from 2.2%, which is 0.7 percentage points fewer.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,026 | 66.1% | 0.8% |
| Period 6 of 2026-27 | 1,052 | 61.7% | 1.5% |
| Period 5 of 2026-27 | 1,019 | 64.8% | 2.6% |
| Period 4 of 2026-27 | 1,046 | 68.3% | 2.5% |
| Period 3 of 2026-27 | 1,016 | 66.2% | 2.3% |
| Period 2 of 2026-27 | 999 | 71.0% | 1.1% |
| Period 1 of 2026-27 | 1,182 | 83.4% | 0.7% |
| Period 13 of 2025-26 | 1,061 | 87.2% | 1.7% |
| Period 12 of 2025-26 | 796 | 87.1% | 0.8% |
| Period 11 of 2025-26 | 1,016 | 84.8% | 1.4% |
| Period 10 of 2025-26 | 981 | 80.9% | 0.6% |
| Period 9 of 2025-26 | 978 | 63.2% | 2.0% |
| Period 8 of 2025-26 | 1,039 | 72.3% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Newton-le-Willows
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,013 | 68.1% | 2.9% |
| TransPennine Express | 13,691 | 76.2% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out