TransPennine Express at Newton-le-Willows
All trains at Newton-le-WillowsTransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 13,691 scheduled stops at Newton-le-Willows in the 13 periods to Period 7 of 2026-27, 27% of the station's total. 76.2% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.
TransPennine Express trains at Newton-le-Willows also serve Earlestown (1.7 km west, – on time, – cancelled), St Helens Junction (6.2 km west, – on time, – cancelled), Warrington West (6.8 km south, 70.1% on time, 5.8% cancelled), Warrington Central (6.9 km south, 67.3% on time, 6.9% cancelled), Birchwood (7.3 km south-east, 64.8% on time, 6.9% cancelled) and St Helens Central (7.8 km west, 85.0% on time, 8.4% cancelled), which are the stations on its network closest to Newton-le-Willows.
Within 30 km of here, TransPennine Express runs best at Manchester Airport, 24.6 km south-east (77.8%), and worst at Manchester Oxford Road, 24.6 km east (53.6%).
The busiest TransPennine Express station within 30 km of Newton-le-Willows is Manchester Piccadilly, 25.5 km east, with about 152 scheduled stops a day.
TransPennine Express at Newton-le-Willows improved sharply over the past year. In the latest 13 periods 76.2% of stops came within three minutes of the timetable, up 6.5 percentage points from 69.7% in the 13 before. Cancellations fell to 3.5% of scheduled stops from 4.9%, which is 1.4 percentage points fewer.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,063 | 75.7% | 3.1% |
| Period 6 of 2026-27 | 1,034 | 81.0% | 2.8% |
| Period 5 of 2026-27 | 1,026 | 81.8% | 4.9% |
| Period 4 of 2026-27 | 1,045 | 83.6% | 2.7% |
| Period 3 of 2026-27 | 991 | 82.8% | 2.9% |
| Period 2 of 2026-27 | 1,012 | 77.3% | 3.2% |
| Period 1 of 2026-27 | 1,184 | 79.3% | 2.8% |
| Period 13 of 2025-26 | 1,111 | 82.1% | 2.3% |
| Period 12 of 2025-26 | 1,174 | 81.6% | 1.8% |
| Period 11 of 2025-26 | 1,032 | 75.8% | 4.9% |
| Period 10 of 2025-26 | 942 | 72.8% | 4.2% |
| Period 9 of 2025-26 | 1,048 | 54.0% | 5.4% |
| Period 8 of 2025-26 | 1,029 | 59.8% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Newton-le-Willows
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,013 | 68.1% | 2.9% |
| Transport for Wales | 13,211 | 73.6% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out