New Holland
NHLYorkshire and The HumberManaged by East Midlands Railway
How this station is performing
New Holland had 5,165 scheduled stops to Period 7 of 2026-27, about 14 a day. 75.5% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
New Holland opened on 1 March 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hessle is the oldest (1840) and Barton-on-Humber the newest (1849), with New Holland in between.
The nearest stations to New Holland are Barrow Haven (2.2 km west), Goxhill (3.2 km south-east), Hull (4.7 km north), Barton-on-Humber (5.7 km west) and Hessle (5.7 km west). 9 stations lie within 10 km in all. Of the five, Hessle is the most punctual at 80.6% and Goxhill the least at 72.4%, with New Holland on 75.5%.
Across the whole run of data, the weakest four-week period for New Holland was Period 6 of 2023-24, at 51.9%, some time before the latest year. The strongest was Period 13 of 2025-26, at 87.7%, and the two are 35.8 percentage points apart. Cancellations peaked at 13.6% of scheduled stops in Period 10 of 2024-25, against 5.0% over the latest 13 periods.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than New Holland on 75.5%. The comparison group includes Barrow Haven (75.6%), Barton-on-Humber (73.7%) and Goxhill (72.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5,165 | 75.5% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at New Holland? Delay Repay
These operators call at New Holland and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 366 | 82.3% | 1.6% |
| Period 6 of 2026-27 | 416 | 82.7% | 6.3% |
| Period 5 of 2026-27 | 416 | 56.9% | 11.1% |
| Period 4 of 2026-27 | 416 | 73.7% | 2.9% |
| Period 3 of 2026-27 | 416 | 73.9% | 4.8% |
| Period 2 of 2026-27 | 392 | 73.7% | 8.2% |
| Period 1 of 2026-27 | 448 | 83.0% | 3.6% |
| Period 13 of 2025-26 | 416 | 87.7% | 3.6% |
| Period 12 of 2025-26 | 384 | 83.9% | 2.1% |
| Period 11 of 2025-26 | 381 | 80.5% | 3.9% |
| Period 10 of 2025-26 | 346 | 74.5% | 6.9% |
| Period 9 of 2025-26 | 384 | 61.2% | 5.2% |
| Period 8 of 2025-26 | 384 | 69.7% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barrow Haven | 5,165 | 75.6% | 5.0% |
| Barton-on-Humber | 5,165 | 73.7% | 5.0% |
| Goxhill | 5,165 | 72.4% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out