New Cross Gate
NXGLondonManaged by London Overground
How this station is performing
New Cross Gate had 136,490 scheduled stops to Period 7 of 2026-27, about 375 a day. 91.6% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
New Cross Gate opened on 5 June 1839, 187 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Deptford is the oldest (1836) and Nunhead the newest (1871), with New Cross Gate in between.
The nearest stations to New Cross Gate are New Cross (0.5 km east), Deptford (1.0 km north-east), Queens Road (Peckham) (1.2 km west), Brockley (1.2 km south) and Nunhead (1.3 km south-west). 134 stations lie within 10 km in all. Of the five, Brockley is the most punctual at 92.5% and Nunhead the least at 85.8%, with New Cross Gate on 91.6%.
New Cross Gate is named after New Cross, an area of London, home to about 15,756 people, but the station stands 0.7 km from its centre.
2 operators call at New Cross Gate: London Overground (91.3%, 80% of stops) and GTR (92.9%, 20% of stops). They are close together, with GTR leading on 92.9% and London Overground trailing on 91.3%, a gap of 1.6 percentage points.
1 of 3 stations of a similar size in London are more punctual than New Cross Gate on 91.6%. The comparison group includes Bromley South (82.4%), Hackney Downs (92.3%) and Ealing Broadway (82.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 109,618 | 91.3% | 3.8% |
| GTR | 26,872 | 92.9% | 3.7% |
Operators with their own page for this station are linked to it.
Late train at New Cross Gate? Delay Repay
These operators call at New Cross Gate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,519 | 89.7% | 3.2% |
| Period 6 of 2026-27 | 10,324 | 87.2% | 4.5% |
| Period 5 of 2026-27 | 10,126 | 88.7% | 9.0% |
| Period 4 of 2026-27 | 10,584 | 92.2% | 5.6% |
| Period 3 of 2026-27 | 10,564 | 92.6% | 2.9% |
| Period 2 of 2026-27 | 10,268 | 93.4% | 3.2% |
| Period 1 of 2026-27 | 12,005 | 93.1% | 3.6% |
| Period 13 of 2025-26 | 11,109 | 94.0% | 2.6% |
| Period 12 of 2025-26 | 10,362 | 93.1% | 3.6% |
| Period 11 of 2025-26 | 10,198 | 91.1% | 3.5% |
| Period 10 of 2025-26 | 9,890 | 93.8% | 1.9% |
| Period 9 of 2025-26 | 10,421 | 90.6% | 2.6% |
| Period 8 of 2025-26 | 10,120 | 91.0% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bromley South | 138,845 | 82.4% | 2.0% |
| Hackney Downs | 133,822 | 92.3% | 2.1% |
| Ealing Broadway | 133,358 | 82.9% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out