GTR at New Cross Gate
How this operator is doing here
GTR had 26,872 scheduled stops at New Cross Gate in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 92.9% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
GTR trains at New Cross Gate also serve Deptford (1.0 km north-east, 84.1% on time, 6.8% cancelled), Queens Road (Peckham) (1.2 km west, 94.8% on time, 2.5% cancelled), Brockley (1.2 km south, 94.1% on time, 3.7% cancelled), Nunhead (1.3 km south-west, 85.6% on time, 4.2% cancelled), South Bermondsey (1.7 km north-west, 94.1% on time, 2.5% cancelled) and Greenwich (1.8 km east, 81.9% on time, 6.7% cancelled), which are the stations on its network closest to New Cross Gate.
Within 30 km of here, GTR runs best at Beckenham Junction, 7.2 km south (98.1%), and worst at Kenley, 17.3 km south (66.9%).
The busiest GTR station within 30 km of New Cross Gate is East Croydon, 11.7 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at New Cross Gate, GTR is the most punctual, at 92.9%.
For GTR, New Cross Gate is the 18th best of 307 ranked stations. Its 92.9% here is 10.0 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,084 | 91.0% | 6.8% |
| Period 6 of 2026-27 | 2,045 | 85.1% | 2.1% |
| Period 5 of 2026-27 | 2,045 | 89.7% | 4.9% |
| Period 4 of 2026-27 | 2,208 | 93.8% | 2.9% |
| Period 3 of 2026-27 | 2,125 | 93.7% | 2.2% |
| Period 2 of 2026-27 | 1,994 | 95.2% | 3.2% |
| Period 1 of 2026-27 | 2,317 | 94.8% | 4.5% |
| Period 13 of 2025-26 | 2,317 | 94.9% | 3.1% |
| Period 12 of 2025-26 | 2,021 | 94.6% | 4.3% |
| Period 11 of 2025-26 | 1,801 | 93.0% | 3.6% |
| Period 10 of 2025-26 | 1,960 | 94.2% | 2.5% |
| Period 9 of 2025-26 | 1,977 | 94.1% | 1.3% |
| Period 8 of 2025-26 | 1,978 | 93.3% | 6.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at New Cross Gate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 109,618 | 91.3% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out