London Overground had 109,618 scheduled stops at New Cross Gate in the 13 periods to Period 7 of 2026-27, 80% of the station's total. 91.3% of recorded arrivals came within three minutes and 3.8% of stops were cancelled.
London Overground trains at New Cross Gate also serve New Cross (0.5 km east, 93.3% on time, 5.8% cancelled), Queens Road (Peckham) (1.2 km west, 85.3% on time, 4.5% cancelled), Brockley (1.2 km south, 92.1% on time, 3.7% cancelled), Surrey Quays (2.1 km north, 91.7% on time, 4.4% cancelled), Peckham Rye (2.1 km west, 90.3% on time, 4.5% cancelled) and Canada Water (2.6 km north, 91.6% on time, 3.8% cancelled), which are the stations on its network closest to New Cross Gate.
Within 30 km of here, London Overground runs best at Romford, 19.0 km north-east (99.7%), and worst at Finchley Road and Frognal, 12.9 km north-west (75.2%).
The busiest London Overground station within 30 km of New Cross Gate is Highbury and Islington, 9.0 km north-west, with about 593 scheduled stops a day.
Of the 2 operators with enough records at New Cross Gate, London Overground is the least punctual, at 91.3%.
For London Overground, New Cross Gate is the 64th best of 111 ranked stations. Its 91.3% here is 1.9 percentage points above the 89.4% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,435 | 89.4% | 2.3% |
| Period 6 of 2026-27 | 8,279 | 87.7% | 5.1% |
| Period 5 of 2026-27 | 8,081 | 88.5% | 10.1% |
| Period 4 of 2026-27 | 8,376 | 91.8% | 6.3% |
| Period 3 of 2026-27 | 8,439 | 92.3% | 3.1% |
| Period 2 of 2026-27 | 8,274 | 93.0% | 3.3% |
| Period 1 of 2026-27 | 9,688 | 92.7% | 3.4% |
| Period 13 of 2025-26 | 8,792 | 93.8% | 2.5% |
| Period 12 of 2025-26 | 8,341 | 92.7% | 3.4% |
| Period 11 of 2025-26 | 8,397 | 90.7% | 3.4% |
| Period 10 of 2025-26 | 7,930 | 93.6% | 1.8% |
| Period 9 of 2025-26 | 8,444 | 89.8% | 2.9% |
| Period 8 of 2025-26 | 8,142 | 90.5% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at New Cross Gate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,872 | 92.9% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out