How this station is performing
Mount Vernon had 21,292 scheduled stops to Period 7 of 2026-27, about 58 a day. 72.6% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Mount Vernon opened on 8 January 1866 and closed to passengers on 16 August 1943. It reopened on 4 October 1993, 33 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Newton (Lanark) is the oldest (1852) and Garrowhill the newest (1936), with Mount Vernon in between.
The nearest stations to Mount Vernon are Baillieston (1.3 km east), Garrowhill (1.7 km north), Carmyle (1.7 km south-west), Shettleston (2.2 km north-west) and Newton (Lanark) (2.4 km south). 59 stations lie within 10 km in all. Of the five, Newton (Lanark) is the most punctual at 88.7% and Carmyle the least at 70.9%, with Mount Vernon on 72.6%.
Mount Vernon has slipped sharply. 72.6% of stops came within three minutes of the timetable in the latest 13 periods, 5.1 percentage points worse than the 77.7% recorded in the 13 before. Cancellations fell to 1.7% of scheduled stops from 2.6%, which is 0.9 percentage points fewer.
Compared with 3 stations of a similar size in Scotland, Mount Vernon is the most punctual, at 72.6%. The comparison group includes Baillieston (72.0%), Bargeddie (69.7%) and Carmyle (70.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 21,292 | 72.6% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Mount Vernon? Delay Repay
These operators call at Mount Vernon and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,592 | 66.8% | 2.6% |
| Period 6 of 2026-27 | 1,652 | 72.4% | 0.8% |
| Period 5 of 2026-27 | 1,622 | 70.3% | 1.2% |
| Period 4 of 2026-27 | 1,652 | 74.4% | 3.1% |
| Period 3 of 2026-27 | 1,622 | 74.5% | 1.0% |
| Period 2 of 2026-27 | 1,652 | 72.9% | 1.2% |
| Period 1 of 2026-27 | 1,907 | 74.8% | 2.0% |
| Period 13 of 2025-26 | 1,807 | 76.3% | 1.1% |
| Period 12 of 2025-26 | 1,652 | 77.1% | 1.6% |
| Period 11 of 2025-26 | 1,652 | 77.6% | 1.2% |
| Period 10 of 2025-26 | 1,164 | 72.4% | 3.2% |
| Period 9 of 2025-26 | 1,662 | 67.4% | 1.9% |
| Period 8 of 2025-26 | 1,656 | 66.1% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Baillieston | 21,292 | 72.0% | 1.7% |
| Bargeddie | 21,292 | 69.7% | 1.7% |
| Carmyle | 21,292 | 70.9% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out