Bargeddie
BGIScotlandManaged by ScotRail
How this station is performing
Bargeddie had 21,292 scheduled stops to Period 7 of 2026-27, about 58 a day. 69.7% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Bargeddie opened on 1 May 1934 and closed to passengers on 5 October 1964. It reopened on 4 October 1993, 33 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Bargeddie is the newest; the oldest, Coatbridge Central, opened in 1843.
The nearest stations to Bargeddie are Kirkwood (1.6 km east), Easterhouse (2.3 km north-west), Blairhill (2.6 km north-east), Baillieston (2.6 km west) and Coatbridge Central (2.9 km north-east). 39 stations lie within 10 km in all. At 69.7%, Bargeddie is less punctual than all of them; the best of the five, Coatbridge Central, manages 94.3%.
Bargeddie takes its name from a Village called Bargeddie, home to about 2,960 people, and the station stands 0.2 km from its centre.
Bargeddie has slipped a little, from 74.5% within three minutes in the previous 13 periods to 69.7% in the latest 13, a fall of 4.8 percentage points. Cancellations fell to 1.7% of scheduled stops from 2.6%, which is 0.9 percentage points fewer.
Compared with 3 stations of a similar size in Scotland, Bargeddie is the least punctual, at 69.7%. All of them are ahead, including Baillieston (72.0%), Carmyle (70.9%) and Kirkwood (75.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 21,292 | 69.7% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Bargeddie? Delay Repay
These operators call at Bargeddie and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,592 | 64.0% | 2.6% |
| Period 6 of 2026-27 | 1,652 | 70.3% | 0.8% |
| Period 5 of 2026-27 | 1,622 | 67.5% | 1.2% |
| Period 4 of 2026-27 | 1,652 | 72.0% | 3.1% |
| Period 3 of 2026-27 | 1,622 | 71.1% | 1.0% |
| Period 2 of 2026-27 | 1,652 | 69.0% | 1.2% |
| Period 1 of 2026-27 | 1,907 | 71.9% | 2.0% |
| Period 13 of 2025-26 | 1,807 | 73.8% | 1.1% |
| Period 12 of 2025-26 | 1,652 | 74.1% | 1.6% |
| Period 11 of 2025-26 | 1,652 | 74.6% | 1.2% |
| Period 10 of 2025-26 | 1,164 | 69.6% | 3.1% |
| Period 9 of 2025-26 | 1,662 | 64.0% | 1.9% |
| Period 8 of 2025-26 | 1,656 | 62.8% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Baillieston | 21,292 | 72.0% | 1.7% |
| Carmyle | 21,292 | 70.9% | 1.7% |
| Kirkwood | 21,292 | 75.4% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out