Carmyle
CMLScotlandManaged by ScotRail
How this station is performing
Carmyle had 21,292 scheduled stops to Period 7 of 2026-27, about 58 a day. 70.9% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Carmyle opened on 8 January 1866 and closed to passengers on 5 October 1964. It reopened on 4 October 1993, 33 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Cambuslang is the oldest (1849) and Kirkhill the newest (1904), with Carmyle in between.
The nearest stations to Carmyle are Mount Vernon (1.7 km north-east), Cambuslang (1.9 km south-west), Shettleston (2.2 km north), Newton (Lanark) (2.3 km south-east) and Kirkhill (2.3 km south). 66 stations lie within 10 km in all. At 70.9%, Carmyle is less punctual than all of them; the best of the five, Kirkhill, manages 93.5%.
Carmyle has slipped sharply. 70.9% of stops came within three minutes of the timetable in the latest 13 periods, 5.5 percentage points worse than the 76.4% recorded in the 13 before. Cancellations fell to 1.7% of scheduled stops from 2.6%, which is 0.9 percentage points fewer.
2 of 3 stations of a similar size in Scotland are more punctual than Carmyle on 70.9%. The comparison group includes Baillieston (72.0%), Bargeddie (69.7%) and Kirkwood (75.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 21,292 | 70.9% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Carmyle? Delay Repay
These operators call at Carmyle and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,592 | 65.1% | 2.6% |
| Period 6 of 2026-27 | 1,652 | 70.5% | 0.8% |
| Period 5 of 2026-27 | 1,622 | 68.5% | 1.2% |
| Period 4 of 2026-27 | 1,652 | 72.9% | 3.1% |
| Period 3 of 2026-27 | 1,622 | 72.5% | 1.0% |
| Period 2 of 2026-27 | 1,652 | 70.4% | 1.2% |
| Period 1 of 2026-27 | 1,907 | 73.0% | 2.0% |
| Period 13 of 2025-26 | 1,807 | 74.6% | 1.1% |
| Period 12 of 2025-26 | 1,652 | 75.4% | 1.6% |
| Period 11 of 2025-26 | 1,652 | 76.7% | 1.2% |
| Period 10 of 2025-26 | 1,164 | 71.2% | 3.2% |
| Period 9 of 2025-26 | 1,662 | 65.7% | 1.9% |
| Period 8 of 2025-26 | 1,656 | 64.3% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Baillieston | 21,292 | 72.0% | 1.7% |
| Bargeddie | 21,292 | 69.7% | 1.7% |
| Kirkwood | 21,292 | 75.4% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out