Moreton (Dorset)
MTNSouth WestManaged by South Western Railway
How this station is performing
Moreton (Dorset) had 14,908 scheduled stops to Period 7 of 2026-27, about 41 a day. 75.2% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Moreton (Dorset) opened on 1 June 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Moreton (Dorset) is the oldest; the next oldest, Wool, dates from 1847.
The nearest stations to Moreton (Dorset) are Wool (6.9 km east), Dorchester South (8.7 km west), Dorchester West (9.1 km west), Upwey (12.3 km south-west) and Weymouth (13.7 km south-west). 3 stations lie within 10 km in all. Of the five, Upwey is the most punctual at 86.9% and Wool the least at 71.1%, with Moreton (Dorset) on 75.2%.
Moreton (Dorset) is named after Moreton, a Village, home to about 373 people, but the station stands 2.5 km from its centre.
Moreton (Dorset) has slipped a little, from 79.7% within three minutes in the previous 13 periods to 75.2% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 4.9% of scheduled stops from 4.3%, which is 0.6 percentage points more.
2 of 3 stations of a similar size in South West are more punctual than Moreton (Dorset) on 75.2%. The comparison group includes Bedwyn (78.4%), Freshford (76.7%) and Gillingham (Dorset) (62.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 14,908 | 75.2% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Moreton (Dorset)? Delay Repay
These operators call at Moreton (Dorset) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,194 | 67.1% | 4.4% |
| Period 6 of 2026-27 | 1,194 | 78.5% | 1.4% |
| Period 5 of 2026-27 | 1,188 | 70.4% | 4.2% |
| Period 4 of 2026-27 | 1,145 | 66.5% | 5.1% |
| Period 3 of 2026-27 | 1,121 | 74.1% | 6.2% |
| Period 2 of 2026-27 | 1,148 | 70.5% | 6.7% |
| Period 1 of 2026-27 | 1,312 | 86.3% | 2.9% |
| Period 13 of 2025-26 | 1,266 | 81.2% | 3.8% |
| Period 12 of 2025-26 | 1,148 | 81.5% | 7.9% |
| Period 11 of 2025-26 | 1,146 | 83.0% | 8.1% |
| Period 10 of 2025-26 | 1,035 | 76.7% | 3.1% |
| Period 9 of 2025-26 | 864 | 67.8% | 4.4% |
| Period 8 of 2025-26 | 1,147 | 70.3% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bedwyn | 14,970 | 78.4% | 3.1% |
| Freshford | 14,997 | 76.7% | 4.8% |
| Gillingham (Dorset) | 15,009 | 62.7% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out