Freshford
FFDSouth WestManaged by Great Western Railway
How this station is performing
Freshford had 14,997 scheduled stops to Period 7 of 2026-27, about 41 a day. 76.7% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Freshford opened on 2 February 1857, 169 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bath Spa is the oldest (1840) and Oldfield Park the newest (1929), with Freshford in between.
The nearest stations to Freshford are Avoncliff (1.4 km east), Bradford-on-Avon (3.3 km east), Bath Spa (5.6 km north-west), Trowbridge (6.5 km east) and Oldfield Park (6.9 km north-west). 5 stations lie within 10 km in all. Of the five, Avoncliff is the most punctual at 77.6% and Bath Spa the least at 68.5%, with Freshford on 76.7%.
Freshford takes its name from a Village called Freshford, home to about 554 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Freshford was Period 9 of 2024-25, at 62.6%, some time before the latest year. The strongest was Period 1 of 2025-26, at 86.5%, and the two are 23.9 percentage points apart. Cancellations peaked at 12.5% of scheduled stops in Period 9 of 2024-25, against 4.8% over the latest 13 periods.
1 of 3 stations of a similar size in South West are more punctual than Freshford on 76.7%. The comparison group includes Gillingham (Dorset) (62.7%), Bedwyn (78.4%) and Moreton (Dorset) (75.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,997 | 76.7% | 4.8% |
Operators with their own page for this station are linked to it.
Late train at Freshford? Delay Repay
These operators call at Freshford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,158 | 74.3% | 4.3% |
| Period 6 of 2026-27 | 1,165 | 77.5% | 2.8% |
| Period 5 of 2026-27 | 1,136 | 72.3% | 4.6% |
| Period 4 of 2026-27 | 1,158 | 67.2% | 6.6% |
| Period 3 of 2026-27 | 1,080 | 79.5% | 9.9% |
| Period 2 of 2026-27 | 1,100 | 72.0% | 7.5% |
| Period 1 of 2026-27 | 1,226 | 83.6% | 1.9% |
| Period 13 of 2025-26 | 1,275 | 82.4% | 4.4% |
| Period 12 of 2025-26 | 1,158 | 85.7% | 1.8% |
| Period 11 of 2025-26 | 1,155 | 83.2% | 3.9% |
| Period 10 of 2025-26 | 1,054 | 74.5% | 4.5% |
| Period 9 of 2025-26 | 1,172 | 67.3% | 6.5% |
| Period 8 of 2025-26 | 1,160 | 75.7% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gillingham (Dorset) | 15,009 | 62.7% | 3.1% |
| Bedwyn | 14,970 | 78.4% | 3.1% |
| Moreton (Dorset) | 14,908 | 75.2% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out