Bedwyn
BDWSouth WestManaged by Great Western Railway
How this station is performing
Bedwyn had 14,970 scheduled stops to Period 7 of 2026-27, about 41 a day. 78.4% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Bedwyn opened on 11 November 1862, 164 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bedwyn is the newest; the oldest, Hungerford, opened in 1847.
The nearest stations to Bedwyn are Hungerford (7.2 km north-east), Kintbury (11.0 km east), Pewsey (12.6 km west), Newbury (19.3 km east) and Andover (20.1 km south). 1 stations lie within 10 km in all. Of the five, Kintbury is the most punctual at 79.9% and Pewsey the least at 49.1%, with Bedwyn on 78.4%.
Bedwyn is named after Great Bedwyn, a Village, home to about 1,361 people, but the station stands 0.2 km from its centre.
For Bedwyn, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 66.9% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2025-26, at 86.6%, which is 19.7 percentage points higher. Cancellations peaked at 14.3% of scheduled stops in Period 10 of 2023-24, against 3.1% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Bedwyn is the most punctual, at 78.4%. The comparison group includes Freshford (76.7%), Gillingham (Dorset) (62.7%) and Moreton (Dorset) (75.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,970 | 78.4% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Bedwyn? Delay Repay
These operators call at Bedwyn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,151 | 82.2% | 3.4% |
| Period 6 of 2026-27 | 1,137 | 75.8% | 3.2% |
| Period 5 of 2026-27 | 1,161 | 73.9% | 2.9% |
| Period 4 of 2026-27 | 1,157 | 71.6% | 6.1% |
| Period 3 of 2026-27 | 1,024 | 77.2% | 4.8% |
| Period 2 of 2026-27 | 1,151 | 80.8% | 3.2% |
| Period 1 of 2026-27 | 1,326 | 83.2% | 1.9% |
| Period 13 of 2025-26 | 1,261 | 85.3% | 2.1% |
| Period 12 of 2025-26 | 1,138 | 83.8% | 1.3% |
| Period 11 of 2025-26 | 1,156 | 83.3% | 3.4% |
| Period 10 of 2025-26 | 1,014 | 80.6% | 2.7% |
| Period 9 of 2025-26 | 1,140 | 66.9% | 2.2% |
| Period 8 of 2025-26 | 1,154 | 72.8% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Freshford | 14,997 | 76.7% | 4.8% |
| Gillingham (Dorset) | 15,009 | 62.7% | 3.1% |
| Moreton (Dorset) | 14,908 | 75.2% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out