Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Lydney

All trains at LydneyCrossCountry across BritainSouth West

On time, last 13 periods74.7%Whole station: 68.1%
Cancelled13.3%Whole station: 6.5%
Scheduled stops4,196Of 14,789 at the station

How this operator is doing here

CrossCountry had 4,196 scheduled stops at Lydney in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 74.7% of recorded arrivals came within three minutes and 13.3% of stops were cancelled.

CrossCountry trains at Lydney also serve Chepstow (12.7 km south-west, 77.6% on time, 11.8% cancelled), Yate (20.4 km south, – on time, – cancelled), Caldicot (21.4 km south-west, 80.4% on time, 16.1% cancelled), Bristol Parkway (22.3 km south, 59.0% on time, 4.7% cancelled), Severn Tunnel Junction (22.3 km south-west, 78.8% on time, 16.1% cancelled) and Gloucester (26.2 km north-east, 68.9% on time, 11.9% cancelled), which are the stations on its network closest to Lydney.

Within 30 km of here, CrossCountry runs best at Chepstow, 12.7 km south-west (77.6%), and worst at Bristol Temple Meads, 29.7 km south (57.7%).

The busiest CrossCountry station within 30 km of Lydney is Bristol Temple Meads, 29.7 km south, with about 58 scheduled stops a day.

CrossCountry at Lydney has slipped a little, from 79.1% within three minutes in the previous 13 periods to 74.7% in the latest 13, a fall of 4.4 percentage points. Cancellations rose to 13.3% of scheduled stops from 10.9%, which is 2.4 percentage points more.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 81.6%Period 2 of 2023-24: 58.7%Period 3 of 2023-24: 66.5%Period 4 of 2023-24: 72.3%Period 5 of 2023-24: 70.5%Period 6 of 2023-24: 69.4%Period 7 of 2023-24: 64.9%Period 8 of 2023-24: 58.6%Period 9 of 2023-24: 63.0%Period 10 of 2023-24: 81.5%Period 11 of 2023-24: 79.3%Period 12 of 2023-24: 78.4%Period 13 of 2023-24: 75.5%Period 1 of 2024-25: 75.4%Period 2 of 2024-25: 77.0%Period 3 of 2024-25: 82.5%Period 4 of 2024-25: 61.7%Period 5 of 2024-25: 74.6%Period 6 of 2024-25: 80.8%Period 7 of 2024-25: 71.7%Period 8 of 2024-25: 75.4%Period 9 of 2024-25: 67.9%Period 10 of 2024-25: 81.9%Period 11 of 2024-25: 78.6%Period 12 of 2024-25: 81.2%Period 13 of 2024-25: 84.2%Period 1 of 2025-26: 84.3%Period 2 of 2025-26: 81.6%Period 3 of 2025-26: 73.5%Period 4 of 2025-26: 77.7%Period 5 of 2025-26: 78.5%Period 6 of 2025-26: 80.2%Period 7 of 2025-26: 80.6%Period 8 of 2025-26: 76.4%Period 9 of 2025-26: 67.2%Period 10 of 2025-26: 71.6%Period 11 of 2025-26: 85.0%Period 12 of 2025-26: 81.7%Period 13 of 2025-26: 73.6%Period 1 of 2026-27: 80.8%Period 2 of 2026-27: 72.3%Period 3 of 2026-27: 77.3%Period 4 of 2026-27: 71.3%Period 5 of 2026-27: 65.9%Period 6 of 2026-27: 70.4%Period 7 of 2026-27: 71.2%
This pageGreat Britain
0%10%20%30%40%Period 1 of 2023-24: 8.0%Period 2 of 2023-24: 6.0%Period 3 of 2023-24: 27.8%Period 4 of 2023-24: 22.3%Period 5 of 2023-24: 7.8%Period 6 of 2023-24: 13.9%Period 7 of 2023-24: 16.1%Period 8 of 2023-24: 16.0%Period 9 of 2023-24: 19.5%Period 10 of 2023-24: 34.9%Period 11 of 2023-24: 9.4%Period 12 of 2023-24: 22.8%Period 13 of 2023-24: 4.5%Period 1 of 2024-25: 8.4%Period 2 of 2024-25: 11.7%Period 3 of 2024-25: 19.3%Period 4 of 2024-25: 14.7%Period 5 of 2024-25: 12.3%Period 6 of 2024-25: 5.4%Period 7 of 2024-25: 5.3%Period 8 of 2024-25: 11.8%Period 9 of 2024-25: 22.3%Period 10 of 2024-25: 19.2%Period 11 of 2024-25: 1.6%Period 12 of 2024-25: 7.2%Period 13 of 2024-25: 4.9%Period 1 of 2025-26: 9.7%Period 2 of 2025-26: 5.5%Period 3 of 2025-26: 16.0%Period 4 of 2025-26: 18.7%Period 5 of 2025-26: 4.8%Period 6 of 2025-26: 7.2%Period 7 of 2025-26: 7.7%Period 8 of 2025-26: 8.5%Period 9 of 2025-26: 19.3%Period 10 of 2025-26: 22.4%Period 11 of 2025-26: 7.1%Period 12 of 2025-26: 6.0%Period 13 of 2025-26: 7.5%Period 1 of 2026-27: 5.9%Period 2 of 2026-27: 22.9%Period 3 of 2026-27: 14.8%Period 4 of 2026-27: 11.7%Period 5 of 2026-27: 13.4%Period 6 of 2026-27: 19.8%Period 7 of 2026-27: 17.1%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2729371.2%17.1%
Period 6 of 2026-2733370.4%19.8%
Period 5 of 2026-2726865.9%13.4%
Period 4 of 2026-2733271.3%11.7%
Period 3 of 2026-2729077.3%14.8%
Period 2 of 2026-2733272.3%22.9%
Period 1 of 2026-2738780.8%5.9%
Period 13 of 2025-2636073.6%7.5%
Period 12 of 2025-2633281.7%6.0%
Period 11 of 2025-2632385.0%7.1%
Period 10 of 2025-2629571.6%22.4%
Period 9 of 2025-2633267.2%19.3%
Period 8 of 2025-2631976.4%8.5%

Time of year

60%70%80%90%P1: 80.8%1P2: 72.0%2P3: 75.2%3P4: 70.7%4P5: 70.2%5P6: 75.3%6P7: 71.9%7P8: 69.9%8P9: 66.2%9P10: 77.9%10P11: 81.1%11P12: 80.6%12P13: 77.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Lydney

OperatorScheduled stopsWithin 3 minCancelled
Transport for Wales10,59365.8%3.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out