CrossCountry had 4,196 scheduled stops at Lydney in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 74.7% of recorded arrivals came within three minutes and 13.3% of stops were cancelled.
CrossCountry trains at Lydney also serve Chepstow (12.7 km south-west, 77.6% on time, 11.8% cancelled), Yate (20.4 km south, – on time, – cancelled), Caldicot (21.4 km south-west, 80.4% on time, 16.1% cancelled), Bristol Parkway (22.3 km south, 59.0% on time, 4.7% cancelled), Severn Tunnel Junction (22.3 km south-west, 78.8% on time, 16.1% cancelled) and Gloucester (26.2 km north-east, 68.9% on time, 11.9% cancelled), which are the stations on its network closest to Lydney.
Within 30 km of here, CrossCountry runs best at Chepstow, 12.7 km south-west (77.6%), and worst at Bristol Temple Meads, 29.7 km south (57.7%).
The busiest CrossCountry station within 30 km of Lydney is Bristol Temple Meads, 29.7 km south, with about 58 scheduled stops a day.
CrossCountry at Lydney has slipped a little, from 79.1% within three minutes in the previous 13 periods to 74.7% in the latest 13, a fall of 4.4 percentage points. Cancellations rose to 13.3% of scheduled stops from 10.9%, which is 2.4 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 293 | 71.2% | 17.1% |
| Period 6 of 2026-27 | 333 | 70.4% | 19.8% |
| Period 5 of 2026-27 | 268 | 65.9% | 13.4% |
| Period 4 of 2026-27 | 332 | 71.3% | 11.7% |
| Period 3 of 2026-27 | 290 | 77.3% | 14.8% |
| Period 2 of 2026-27 | 332 | 72.3% | 22.9% |
| Period 1 of 2026-27 | 387 | 80.8% | 5.9% |
| Period 13 of 2025-26 | 360 | 73.6% | 7.5% |
| Period 12 of 2025-26 | 332 | 81.7% | 6.0% |
| Period 11 of 2025-26 | 323 | 85.0% | 7.1% |
| Period 10 of 2025-26 | 295 | 71.6% | 22.4% |
| Period 9 of 2025-26 | 332 | 67.2% | 19.3% |
| Period 8 of 2025-26 | 319 | 76.4% | 8.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lydney
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,593 | 65.8% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out