East Grinstead
EGRSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
East Grinstead had 27,766 scheduled stops to Period 7 of 2026-27, about 76 a day. 88.9% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
East Grinstead opened on 1 August 1882, 144 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Three Bridges is the oldest (1841) and Hever the newest (1888), with East Grinstead in between.
The nearest stations to East Grinstead are Dormans (3.4 km north), Lingfield (5.6 km north), Cowden (Kent) (9.5 km east), Hever (10.0 km north-east) and Three Bridges (10.0 km west). 4 stations lie within 10 km in all. Of the five, Lingfield is the most punctual at 91.5% and Cowden (Kent) the least at 68.4%, with East Grinstead on 88.9%.
East Grinstead takes its name from a market town called East Grinstead, home to about 27,785 people, and the station stands 0.3 km from its centre.
East Grinstead has slipped a little, from 93.6% within three minutes in the previous 13 periods to 88.9% in the latest 13, a fall of 4.7 percentage points. Cancellations held steady at 3.2% of scheduled stops, against 2.8% before.
Compared with 3 stations of a similar size in South East, East Grinstead is the most punctual, at 88.9%. The comparison group includes Littlehaven (79.1%), Higham (84.1%) and Earlswood (Surrey) (76.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,766 | 88.9% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at East Grinstead? Delay Repay
These operators call at East Grinstead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,166 | 83.5% | 3.4% |
| Period 6 of 2026-27 | 2,106 | 71.6% | 2.9% |
| Period 5 of 2026-27 | 2,172 | 81.3% | 4.8% |
| Period 4 of 2026-27 | 2,181 | 91.3% | 2.7% |
| Period 3 of 2026-27 | 2,099 | 91.4% | 2.9% |
| Period 2 of 2026-27 | 1,916 | 93.4% | 1.4% |
| Period 1 of 2026-27 | 2,450 | 96.1% | 1.0% |
| Period 13 of 2025-26 | 2,334 | 93.6% | 3.0% |
| Period 12 of 2025-26 | 2,079 | 91.7% | 2.6% |
| Period 11 of 2025-26 | 2,400 | 92.2% | 3.8% |
| Period 10 of 2025-26 | 1,822 | 92.1% | 2.9% |
| Period 9 of 2025-26 | 1,981 | 88.8% | 4.7% |
| Period 8 of 2025-26 | 2,060 | 87.1% | 5.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Littlehaven | 27,787 | 79.1% | 6.8% |
| Higham | 27,745 | 84.1% | 4.6% |
| Earlswood (Surrey) | 27,727 | 76.2% | 8.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out