Leven
LEVScotlandManaged by ScotRail
How this station is performing
Leven had 23,178 scheduled stops to Period 7 of 2026-27, about 64 a day. 83.4% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Leven opened on 10 August 1854 and closed to passengers on 6 October 1969. It reopened on 2 June 2024, 2 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Markinch is the oldest (1847) and Glenrothes with Thornton the newest (1992), with Leven in between.
The nearest stations to Leven are Cameron Bridge (2.7 km west), Markinch (8.0 km west), Glenrothes with Thornton (9.4 km west), Ladybank (11.7 km north-west) and Springfield (11.8 km north). 3 stations lie within 10 km in all. At 83.4%, Leven is more punctual than every one of them; the best of the five, Springfield, manages 83.3%.
Leven is one of 3 stations named after a town called Leven, home to about 9,040 people; this one stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Leven was Period 4 of 2024-25, at 77.5%, some time before the latest year. The strongest was Period 13 of 2024-25, at 91.7%, and the two are 14.2 percentage points apart.
Compared with 3 stations of a similar size in Scotland, Leven is the most punctual, at 83.4%. The comparison group includes Cameron Bridge (82.3%), Aberdour (80.1%) and Kinghorn (77.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,178 | 83.4% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Leven? Delay Repay
These operators call at Leven and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,585 | 84.6% | 1.2% |
| Period 6 of 2026-27 | 1,828 | 82.8% | 2.0% |
| Period 5 of 2026-27 | 1,832 | 78.9% | 1.7% |
| Period 4 of 2026-27 | 1,824 | 80.1% | 3.4% |
| Period 3 of 2026-27 | 1,824 | 84.1% | 1.4% |
| Period 2 of 2026-27 | 1,788 | 84.1% | 1.3% |
| Period 1 of 2026-27 | 2,026 | 84.7% | 2.0% |
| Period 13 of 2025-26 | 1,916 | 87.3% | 1.3% |
| Period 12 of 2025-26 | 1,752 | 85.8% | 1.4% |
| Period 11 of 2025-26 | 1,762 | 87.2% | 1.5% |
| Period 10 of 2025-26 | 1,537 | 82.3% | 0.7% |
| Period 9 of 2025-26 | 1,752 | 80.4% | 3.3% |
| Period 8 of 2025-26 | 1,752 | 81.8% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cameron Bridge | 23,178 | 82.3% | 1.8% |
| Aberdour | 23,202 | 80.1% | 1.7% |
| Kinghorn | 23,202 | 77.6% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out