Aberdour
AURScotlandManaged by ScotRail
How this station is performing
Aberdour had 23,202 scheduled stops to Period 7 of 2026-27, about 64 a day. 80.1% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Aberdour opened on 2 June 1890, 136 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Burntisland is the oldest (1847) and Dalgety Bay the newest (1998), with Aberdour in between.
The nearest stations to Aberdour are Burntisland (4.2 km east), Dalgety Bay (4.4 km west), Inverkeithing (6.3 km west), Cowdenbeath (6.9 km north-west) and North Queensferry (7.5 km south-west). 12 stations lie within 10 km in all. Of the five, Cowdenbeath is the most punctual at 83.3% and Burntisland the least at 79.0%, with Aberdour on 80.1%.
Aberdour is one of 2 stations named after a Village called Aberdour, home to about 1,710 people; this one stands 0.2 km from its centre.
Aberdour has slipped a little, from 84.7% within three minutes in the previous 13 periods to 80.1% in the latest 13, a fall of 4.6 percentage points. Cancellations held steady at 1.7% of scheduled stops, against 1.8% before.
2 of 3 stations of a similar size in Scotland are more punctual than Aberdour on 80.1%. The comparison group includes Kinghorn (77.6%), Cameron Bridge (82.3%) and Leven (83.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,202 | 80.1% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Aberdour? Delay Repay
These operators call at Aberdour and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,277 | 81.9% | 1.2% |
| Period 6 of 2026-27 | 1,799 | 80.1% | 2.4% |
| Period 5 of 2026-27 | 1,802 | 74.3% | 2.0% |
| Period 4 of 2026-27 | 1,798 | 75.4% | 2.4% |
| Period 3 of 2026-27 | 1,797 | 80.8% | 1.1% |
| Period 2 of 2026-27 | 1,796 | 82.2% | 1.7% |
| Period 1 of 2026-27 | 2,076 | 83.2% | 1.5% |
| Period 13 of 2025-26 | 1,965 | 84.3% | 0.6% |
| Period 12 of 2025-26 | 1,796 | 82.2% | 1.5% |
| Period 11 of 2025-26 | 1,861 | 85.6% | 2.0% |
| Period 10 of 2025-26 | 1,578 | 78.6% | 1.2% |
| Period 9 of 2025-26 | 1,829 | 75.0% | 3.2% |
| Period 8 of 2025-26 | 1,828 | 77.5% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kinghorn | 23,202 | 77.6% | 1.7% |
| Cameron Bridge | 23,178 | 82.3% | 1.8% |
| Leven | 23,178 | 83.4% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out