Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Cameron Bridge

CBXScotlandManaged by ScotRail

On time, last 13 periods82.3%Great Britain: 83.6%
Cancelled1.8%Great Britain: 3.2%
Stops a day64Scheduled, on average
Punctuality rank1324th of 2,374Among ranked stations

How this station is performing

Cameron Bridge had 23,178 scheduled stops to Period 7 of 2026-27, about 64 a day. 82.3% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.

Cameron Bridge opened on 10 August 1854 and closed to passengers on 6 October 1969. It reopened on 2 June 2024, 2 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Markinch is the oldest (1847) and Glenrothes with Thornton the newest (1992), with Cameron Bridge in between.

The nearest stations to Cameron Bridge are Leven (2.7 km east), Markinch (5.4 km west), Glenrothes with Thornton (6.8 km south-west), Ladybank (10.5 km north-west) and Kirkcaldy (11.5 km south-west). 3 stations lie within 10 km in all. Of the five, Leven is the most punctual at 83.4% and Kirkcaldy the least at 78.2%, with Cameron Bridge on 82.3%.

Cameron Bridge takes its name from a Village called Cameron Bridge, and the station stands 0.8 km from its centre.

The time of year matters a great deal for Cameron Bridge. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 77.2%, while period 13 (March) is the strongest at 88.3%, a spread of 11.1 percentage points.

1 of 3 stations of a similar size in Scotland are more punctual than Cameron Bridge on 82.3%. The comparison group includes Leven (83.4%), Aberdour (80.1%) and Kinghorn (77.6%).

Period by period

70%80%90%2023-242024-252025-262026-27Period 3 of 2024-25: 81.8%Period 4 of 2024-25: 78.9%Period 5 of 2024-25: 78.1%Period 6 of 2024-25: 84.1%Period 7 of 2024-25: 84.8%Period 8 of 2024-25: 80.1%Period 9 of 2024-25: 77.9%Period 10 of 2024-25: 77.9%Period 11 of 2024-25: 88.2%Period 12 of 2024-25: 87.6%Period 13 of 2024-25: 90.9%Period 1 of 2025-26: 89.4%Period 2 of 2025-26: 86.1%Period 3 of 2025-26: 84.5%Period 4 of 2025-26: 84.0%Period 5 of 2025-26: 80.9%Period 6 of 2025-26: 83.5%Period 7 of 2025-26: 82.6%Period 8 of 2025-26: 78.4%Period 9 of 2025-26: 76.8%Period 10 of 2025-26: 81.0%Period 11 of 2025-26: 87.3%Period 12 of 2025-26: 85.2%Period 13 of 2025-26: 86.9%Period 1 of 2026-27: 83.8%Period 2 of 2026-27: 83.7%Period 3 of 2026-27: 83.4%Period 4 of 2026-27: 80.0%Period 5 of 2026-27: 78.8%Period 6 of 2026-27: 82.6%Period 7 of 2026-27: 81.5%
This pageGreat Britain
0%2%4%6%Period 3 of 2024-25: 4.5%Period 4 of 2024-25: 2.4%Period 5 of 2024-25: 1.4%Period 6 of 2024-25: 1.3%Period 7 of 2024-25: 0.8%Period 8 of 2024-25: 2.6%Period 9 of 2024-25: 3.1%Period 10 of 2024-25: 2.4%Period 11 of 2024-25: 2.8%Period 12 of 2024-25: 2.7%Period 13 of 2024-25: 1.6%Period 1 of 2025-26: 0.1%Period 2 of 2025-26: 2.6%Period 3 of 2025-26: 1.6%Period 4 of 2025-26: 1.4%Period 5 of 2025-26: 2.6%Period 6 of 2025-26: 1.3%Period 7 of 2025-26: 1.4%Period 8 of 2025-26: 1.4%Period 9 of 2025-26: 3.4%Period 10 of 2025-26: 0.7%Period 11 of 2025-26: 1.5%Period 12 of 2025-26: 1.4%Period 13 of 2025-26: 1.3%Period 1 of 2026-27: 2.0%Period 2 of 2026-27: 1.4%Period 3 of 2026-27: 1.5%Period 4 of 2026-27: 3.5%Period 5 of 2026-27: 1.9%Period 6 of 2026-27: 2.1%Period 7 of 2026-27: 1.2%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail23,17882.3%1.8%

Operators with their own page for this station are linked to it.

Late train at Cameron Bridge? Delay Repay

These operators call at Cameron Bridge and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,58581.5%1.2%
Period 6 of 2026-271,82882.6%2.1%
Period 5 of 2026-271,83278.8%1.9%
Period 4 of 2026-271,82480.0%3.5%
Period 3 of 2026-271,82483.4%1.5%
Period 2 of 2026-271,78883.7%1.4%
Period 1 of 2026-272,02683.8%2.0%
Period 13 of 2025-261,91686.9%1.3%
Period 12 of 2025-261,75285.2%1.4%
Period 11 of 2025-261,76287.3%1.5%
Period 10 of 2025-261,53781.0%0.7%
Period 9 of 2025-261,75276.8%3.4%
Period 8 of 2025-261,75278.4%1.4%

Time of year

75%80%85%90%P1: 85.6%1P2: 84.6%2P3: 83.6%3P4: 81.3%4P5: 79.5%5P6: 83.3%6P7: 82.7%7P8: 79.0%8P9: 77.2%9P10: 79.9%10P11: 87.6%11P12: 86.1%12P13: 88.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Leven23,17883.4%1.8%
Aberdour23,20280.1%1.7%
Kinghorn23,20277.6%1.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out