Kyle of Lochalsh
KYLScotlandManaged by ScotRail
How this station is performing
Kyle of Lochalsh has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,482 scheduled stops, about 7 a day. In those periods 84.0% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Kyle of Lochalsh opened on 2 November 1897, 129 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Stromeferry is the oldest (1870) and Duncraig the newest (1949), with Kyle of Lochalsh in between.
The nearest stations to Kyle of Lochalsh are Duirinish (4.6 km north), Plockton (6.6 km north-east), Duncraig (7.8 km north-east), Stromeferry (12.6 km north-east) and Attadale (20.1 km north-east). 3 stations lie within 10 km in all.
Kyle of Lochalsh takes its name from a Village called Kyle of Lochalsh, home to about 650 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Kyle of Lochalsh was Period 7 of 2025-26, at 67.6%, some time before the latest year. The strongest was Period 13 of 2024-25, at 90.4%, and the two are 22.8 percentage points apart. Cancellations peaked at 10.2% of scheduled stops in Period 10 of 2023-24, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Kyle of Lochalsh is the least punctual, at 84.0%. All of them are ahead, including Achnasheen (86.3%), Garve (87.7%) and Strathcarron (87.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,482 | 84.0% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Kyle of Lochalsh? Delay Repay
These operators call at Kyle of Lochalsh and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 203 | 80.8% | 2.5% |
| Period 6 of 2026-27 | 208 | 78.3% | 2.4% |
| Period 5 of 2026-27 | 208 | 85.3% | 1.9% |
| Period 4 of 2026-27 | 206 | 83.2% | 1.9% |
| Period 3 of 2026-27 | 208 | 85.0% | 1.0% |
| Period 2 of 2026-27 | 204 | 83.3% | 0.5% |
| Period 1 of 2026-27 | 232 | 84.9% | 0.0% |
| Period 13 of 2025-26 | 218 | 85.2% | 0.9% |
| Period 12 of 2025-26 | 200 | 88.0% | 4.0% |
| Period 11 of 2025-26 | 180 | 86.5% | 1.1% |
| Period 10 of 2025-26 | 167 | 82.7% | 3.0% |
| Period 9 of 2025-26 | 197 | 85.3% | 0.0% |
| Period 8 of 2025-26 | 51 | – | – |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Achnasheen | 2,480 | 86.3% | 1.5% |
| Garve | 2,480 | 87.7% | 1.6% |
| Strathcarron | 2,480 | 87.7% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out