Achnasheen
ACNScotlandManaged by ScotRail
How this station is performing
Achnasheen has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,480 scheduled stops, about 7 a day. In those periods 86.3% of stops arrived within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Achnasheen opened on 19 August 1870, 156 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Achnasheen is the oldest; the next oldest, Achanalt, dates from 1870.
The nearest stations to Achnasheen are Achanalt (10.0 km east), Lochluichart (16.4 km east), Achnashellach (19.0 km south-west), Garve (23.2 km east) and Strathcarron (27.5 km south-west). 0 stations lie within 10 km in all. At 86.3%, Achnasheen is less punctual than all of them; the best of the five, Strathcarron, manages 87.7%.
Achnasheen takes its name from a settlement called Achnasheen, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Achnasheen was Period 7 of 2025-26, at 68.7%, some time before the latest year. The strongest was Period 12 of 2024-25, at 93.4%, and the two are 24.7 percentage points apart. Cancellations peaked at 10.2% of scheduled stops in Period 10 of 2023-24, against 1.5% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Achnasheen on 86.3%. The comparison group includes Garve (87.7%), Strathcarron (87.7%) and Kyle of Lochalsh (84.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,480 | 86.3% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Achnasheen? Delay Repay
These operators call at Achnasheen and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 203 | 85.7% | 2.5% |
| Period 6 of 2026-27 | 208 | 88.6% | 2.4% |
| Period 5 of 2026-27 | 208 | 88.6% | 1.9% |
| Period 4 of 2026-27 | 206 | 90.9% | 1.9% |
| Period 3 of 2026-27 | 206 | 84.3% | 1.0% |
| Period 2 of 2026-27 | 204 | 85.7% | 0.5% |
| Period 1 of 2026-27 | 232 | 86.2% | 0.0% |
| Period 13 of 2025-26 | 218 | 88.8% | 0.9% |
| Period 12 of 2025-26 | 200 | 87.0% | 3.5% |
| Period 11 of 2025-26 | 180 | 83.8% | 0.6% |
| Period 10 of 2025-26 | 167 | 83.9% | 3.0% |
| Period 9 of 2025-26 | 197 | 80.6% | 0.0% |
| Period 8 of 2025-26 | 51 | – | – |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Garve | 2,480 | 87.7% | 1.6% |
| Strathcarron | 2,480 | 87.7% | 1.6% |
| Kyle of Lochalsh | 2,482 | 84.0% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out