How this station is performing
Garve has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,480 scheduled stops, about 7 a day. In those periods 87.7% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Garve opened on 19 August 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Dingwall is the oldest (1862) and Conon Bridge the newest (2013), with Garve in between.
The nearest stations to Garve are Lochluichart (7.2 km west), Achanalt (13.5 km west), Conon Bridge (15.9 km east), Dingwall (16.0 km east) and Muir of Ord (17.3 km south-east). 1 stations lie within 10 km in all. Of the five, Muir of Ord is the most punctual at 89.2% and Dingwall the least at 87.1%, with Garve on 87.7%.
Garve takes its name from a settlement called Garve, and the station stands 0.3 km from its centre.
Garve improved sharply over the past year. In the latest 13 periods 87.7% of stops came within three minutes of the timetable, up 5.1 percentage points from 82.6% in the 13 before. Cancellations held steady at 1.6% of scheduled stops, against 1.3% before.
Compared with 3 stations of a similar size in Scotland, Garve is the most punctual, at 87.7%. The comparison group includes Achnasheen (86.3%), Strathcarron (87.7%) and Kyle of Lochalsh (84.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,480 | 87.7% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Garve? Delay Repay
These operators call at Garve and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 203 | 85.4% | 2.5% |
| Period 6 of 2026-27 | 208 | 90.6% | 2.9% |
| Period 5 of 2026-27 | 208 | 92.2% | 1.9% |
| Period 4 of 2026-27 | 206 | 89.7% | 2.4% |
| Period 3 of 2026-27 | 206 | 84.7% | 1.0% |
| Period 2 of 2026-27 | 204 | 89.2% | 0.5% |
| Period 1 of 2026-27 | 232 | 85.8% | 0.0% |
| Period 13 of 2025-26 | 218 | 90.6% | 0.9% |
| Period 12 of 2025-26 | 200 | 92.2% | 3.5% |
| Period 11 of 2025-26 | 180 | 85.9% | 0.6% |
| Period 10 of 2025-26 | 167 | 84.0% | 3.0% |
| Period 9 of 2025-26 | 197 | 80.7% | 0.0% |
| Period 8 of 2025-26 | 51 | – | – |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Achnasheen | 2,480 | 86.3% | 1.5% |
| Strathcarron | 2,480 | 87.7% | 1.6% |
| Kyle of Lochalsh | 2,482 | 84.0% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out